air conditioning unit Tenders | Latest Tenders for air conditioning unit ( Total 424 air conditioning unit tenders found )

Tender Bharat Website covers all Tenders for air conditioning unit โ€“ Including air conditioning unit Government Tenders, e Tender air conditioning unit, air conditioning unit Tenders and Private Tenders. There is no shortage of business opportunities from the largest air conditioning unit Tender Database.

Our website allows you to find air conditioning unit tenders online quickly and easily. Subscribers can also opt to receive daily tender alerts through email from TenderBharat.com to guarantee they don't miss out on any opportunities.

#TBR: 34485583

Security Services

Gem Bids For Rep And Overhauling Service - Repservicing Of ; As Per Scope Of Work; Yes; Buyer Premises

28 May, 2025 ( 0 Days Left )

#TBR: 34470572

Power Plant

Ttps Operation Circle Mpm Ii Acp Servicing Of System Ducts In Control Room, Ventilation Duct Of Iii Fan House To 6.6 Kv Switch Gear Room Etc

28 May, 2025 ( 0 Days Left )

#TBR: 34430509

Industrial Development Agencies

Operation And Comprehensive Maintenance Of Vrf, Vrv And Split, Window

16 May, 2025 ( 0 Days Left )

#TBR: 34413620

Crude Oil / Natural Gas / Mineral Fuels

Gem Bids For Supply Of 2 Ton Split Conditioner As Per Technical Specification Sheet , Additional Copper Tube For 2 Ton Split Ac , Supply And Installation Of Outdoor Stand For 2 Ton Split Ac , Supply And Installation Of Water Drain Pvc Pipe For 2 Ton Split Ac , Installation Of 2 Ton Split Ac As Per Direction Of Engineer-in-charge , Dismantling And Shifting Of 2 Ton As Per Direction Of Engineer-incharge , Supply Of 1.5 Ton Split Conditioner As Per Technical Specification Sheet , Additional Copper Tube For 1.5 Ton Split Ac , Supply And Installation Of Outdoor Stand For 1.5 Ton Split Ac , Supply And Installation Of Water Drain Pvc Pipe For 1.5 Ton Split Ac , Installation Of 1.5 Ton Split Ac As Per Direction Of Engineer-in-charge , Dismantling And Shifting Of 1.5 Ton As Per Direction Of Engineer-in-charge , Supply Of 1 Ton Split Conditioner As Per Technical Specification Sheet , Additional Copper Tube For 1 Ton Split Ac , Supply And Installation Of Outdoor Stand For 1 Ton Split Ac , Supply And Installation Of Water Drain Pvc Pipe For 1 Ton Split Ac , Installation Of 1 Ton Split Ac As Per Direction Of Engineer-in-charge. , Dismantling And Shifting Of 1 Ton As Per Direction Of Engineer-in-charge , Supply And Installation Of 2 Ton Casette Conditioner As Per Technical Specification Sheet , Additional Copper Tube For 2 Ton Casette Ac , Supply And Installation Of Outdoor Stand For 2 Ton Casette Ac , Supply And Installation Of Water Drain Pvc Pipe For 2 Ton Casette Ac , Dismantling And Shifting Of 2 Ton Casette As Per Direction Of Engineer-in-charge

07 May, 2025 ( 0 Days Left )

#TBR: 34404950

Air Transport

Gem Bids For "comprehensive Maintenance Contract Of All Vrv/ Vrf System Including All Idu & Odu Of All Capacity, Ahus & Tfas, Referigerant Copper Pipe, Drain Pipe, Inline Fan, Duct/pvc Pipe With Lt Panel For Odu & Idu Including All Installation As Mentioned In Appendix I Installed In Interim Terminal Building, Kushinagar International port I/c Carrying Out Monthly Visit For Servicing And Maintenance Of All Components As Per Oem Standards By Providing Trained Service Engineer With All Tools And Plant And Spares I/c Attending All Breakdown Reps As & When Required Etc. Complete As Per Instructions Of Engineer In-charge As Required. Note - Total Capacity Of Vrv/vrf Odu Is 400 Hp Of Dakin Make. First Year " "comprehensive Maintenance Contract Of All Vrv/ Vrf System Including All Idu & Odu Of All Capacity, Ahus & Tfas, Referigerant Copper Pipe, Drain Pipe, Inline Fan, Duct/pvc Pipe With Lt Panel For Odu & Idu Including All Installation As Mentioned In Appendix I Installed In Interim Terminal Building, Kushinagar International port I/c Carrying Out Monthly Visit For Servicing And Maintenance Of All Components As Per Oem Standards By Providing Trained Service Engineer With All Tools And Plant And Spares I/c Attending All Breakdown Reps As & When Required Etc. Complete As Per Instructions Of Engineer In-charge As Required. Note - Total Capacity Of Vrv/vrf Odu Is 400 Hp Of Dakin Make. Second Year " "annual Comprehensive Maintenance Of 1.0 Tr, 1.5 Tr And 2.0 Tr Split Type Conditioners Of M/s Voltas/carrier/hitachi/lg/haier Etc. Make Installed At Different Locations Of Kushinagar International port As Mentioned In Appendix I. Works Include Carrying Out Quarterly Visit For Servicing And Maintenance Of Ac s Including Attend To Complaints / Faults / Breakdowns And Taking Rectification Action Ensuring Serviceability/satisfactory Working Condition Of The Systems And Also Includes Refrigerant Gas Charging And Rep/replacement Of Required Spares Parts Like Pcbs, Refrigerrant Pipe, Compressors, All Type Of Relays, Motors, Handset Say Remote, Thermostats, Capacitors, Selector Switches, Expansion Valve Etc. And Maintaing Records/ Documentation As Per Engineer In Charge And As Per Special Condition Of The Contract. Note - 1 Job Equal To Acmc Of 1 No Split Ac (1.0 Tr/1.5 /2.0 Tr) For 1 Year. First Year" "annual Comprehensive Maintenance Of 1.0 Tr, 1.5 Tr And 2.0 Tr Split Type Conditioners Of M/s Voltas/carrier/hitachi/lg/haier Etc. Make Installed At Different Locations Of Kushinagar International port As Mentioned In Appendix I. Works Include Carrying Out Quarterly Visit For Servicing And Maintenance Of Ac s Including Attend To Complaints / Faults / Breakdowns And Taking Rectification Action Ensuring Serviceability/satisfactory Working Condition Of The Systems And Also Includes Refrigerant Gas Charging And Rep/replacement Of Required Spares Parts Like Pcbs, Refrigerrant Pipe, Compressors, All Type Of Relays, Motors, Handset Say Remote, Thermostats, Capacitors, Selector Switches, Expansion Valve Etc. And Maintaing Records/ Documentation As Per Engineer In Charge And As Per Special Condition Of The Contract. Note - 1 Job Equal To Acmc Of 1 No Split Ac (1.0 Tr/1.5 /2.0 Tr) For 1 Year. Second Year" "annual Comprehensive Maintenance Of 1.5 Tr & 2.0 Tr Window Type Conditioners Of M/s Hitachi/o-general Make Installed At Different Locations Of Kushinagar International port As Mentioned In Appendix I. Works Include Carrying Out Quarterly Visit For Servicing And Maintenance Of Ac s Including Attend To Complaints / Faults / Breakdowns And Taking Rectification Action Ensuring Serviceability/satisfactory Working Condition Of The Systems And Also Includes Refrigerant Gas Charging And Rep/replacement Of Required Spares Parts Like Pcbs, Refrigerrant Pipe, Compressors, All Type Of Relays, Motors, Handset Say Remote, Thermostats, Capacitors, Selector Switches, Expansion Valve Etc. And Maintaing Records/ Documentation As Per Engineer In Charge And As Per Special Condition Of The Contract. Note - 1 Job Equal To Acmc Of 1 No. Window Ac (1.5 /2.0 Tr) For 1 Year. First Year" "annual Comprehensive Maintenance Of 1.5 Tr & 2.0 Tr Window Type Conditioners Of M/s Hitachi/o-general Make Installed At Different Locations Of Kushinagar International port As Mentioned In Appendix I. Works Include Carrying Out Quarterly Visit For Servicing And Maintenance Of Ac s Including Attend To Complaints / Faults / Breakdowns And Taking Rectification Action Ensuring Serviceability/satisfactory Working Condition Of The Systems And Also Includes Refrigerant Gas Charging And Rep/replacement Of Required Spares Parts Like Pcbs, Refrigerrant Pipe, Compressors, All Type Of Relays, Motors, Handset Say Remote, Thermostats, Capacitors, Selector Switches, Expansion Valve Etc. And Maintaing Records/ Documentation As Per Engineer In Charge And As Per Special Condition Of The Contract. Note - 1 Job Equal To Acmc Of 1 No. Window Ac (1.5 /2.0 Tr) For 1 Year. Second Year" "annual Comprehensive Maintenance Of 4.0 Tr (inverter Type) Tower Conditioners Of M/s Blue Star / Haier /carrier Etc Make Installed At Atc Tower Of Kushinagar International port As Mentioned In Appendix I. Works Include Carrying Out Quarterly Visit For Servicing And Maintenance Of Ac s Including Attend To Complaints / Faults / Breakdowns And Taking Rectification Action Ensuring Serviceability/satisfactory Working Condition Of The Systems And Also Includes Refrigerant Gas Charging And Rep/replacement Of Required Spares Parts Like Pcbs, Refrigerrant Pipe, Compressors, All Type Of Relays, Motors, Handset Say Remote, Thermostats, Capacitors, Selector Switches, Expansion Valve Etc. And Maintaing Records/ Documentation As Per Engineer In Charge And As Per Special Condition Of The Contract. Note - 1 Job Equal To Acmc Of 1 No. Tower Ac (4.0 Tr) For 1 Year. Second Year" "annual Comprehensive Maintenance Contract Of Existing Oasis Make Recessed Bi-level Drinking Water Fountain, With Double Ss Bubbler And With Mechanical And Sensor Both Through Oem Only Including Servicing, Reping, Supply And Replacement Of All Spares I/c Refrigerant Gas, Compressor Etc. As Per The Requirement And Quarterly Preventive Maintenance Visits And Breakdown Visits Through Oem/oem Authorized Service Dealer Only Strictly As Per The Scope Of Work Of Special Condition Of Contract. Note - 1) 1 Job Equal To Acmc Of 1 No. Drinking Water Fountain With Inbuilt Ro For 1 Year. 2) In This Item, The Replacement Of Consumables Like Pf Candle Filter, Block Filter/carbon & Ro Membrane Are Covered Only One Times In A Year. First Year" "annual Comprehensive Maintenance Contract Of Existing Oasis Make Recessed Bi-level Drinking Water Fountain, With Double Ss Bubbler And With Mechanical And Sensor Both Through Oem Only Including Servicing, Reping, Supply And Replacement Of All Spares I/c Refrigerant Gas, Compressor Etc. As Per The Requirement And Quarterly Preventive Maintenance Visits And Breakdown Visits Through Oem/oem Authorized Service Dealer Only Strictly As Per The Scope Of Work Of Special Condition Of Contract. Note - 1) 1 Job Equal To Acmc Of 1 No. Drinking Water Fountain With Inbuilt Ro For 1 Year. 2) In This Item, The Replacement Of Consumables Like Pf Candle Filter, Block Filter/carbon & Ro Membrane Are Covered Only One Times In A Year. Second Year" Replacement Of Candel 20 Inch /as Per Oem Recommendation And As When Required. (make-oasis) Replacement Of Block 20 Inch /as Per Oem Recommendation And As When Required. (make-oasis) Replacement Of Pf Candel 20 Inch /as Per Oem Recommendation And As When Required. (make-oasis) Replacement Of Gac Filter 20 Inch /as Per Oem Recommendation And As When Required.(make-oasis) "replacement Of Membrane /as Per Oem Recommendation And As When Required (make-oasis) " "annual Comprehensive Maintenance Contract Of 80 Ltrs/hr Water Coolers With Inbuilt Water Purifier (ro Plus Uv) Having Storage Capacity Of Blue Star/cilmatrol Etc.make At Different Locations Of Kushinagar International port. Work Include Carrying Out Quarterly Visit For Servicing And Maintenance Of Water Cooler With Ro s Including Attend To Complaints / Faults / Breakdowns And Taking Rectification Action Ensuring Serviceability/satisfactory Working Condition Of The Systems And Also Includes Refrigerant Gas Charging And Rep/replacement Of Required Spares Parts Like Pcbs, Refrigerrant Pipe, Compressors, All Type Of Relays, Motors, Thermostats, Capacitors, Solenoid Valve Etc. Through Oem Or Authorized Oem Service Dealer And Maintaing Records/ Documentation As Per Engineer Incharge And As Per Special Condition Of The Contract. Note - 1) 1 Job Equal To Acmc Of 1 No. Water Cooler With Inbuilt Ro For 1 Year. 2) In This Item, The Replacement Of Consumables Like Pf Candle Filter, Block Filter/carbon & Ro Membrane Are Covered Only One Times In A Year. First Year" "annual Comprehensive Maintenance Contract Of 80 Ltrs/hr Water Coolers With Inbuilt Water Purifier (ro Plus Uv) Having Storage Capacity Of Blue Star/cilmatrol Etc.make At Different Locations Of Kushinagar International port. Work Include Carrying Out Quarterly Visit For Servicing And Maintenance Of Water Cooler With Ro s Including Attend To Complaints / Faults / Breakdowns And Taking Rectification Action Ensuring Serviceability/satisfactory Working Condition Of The Systems And Also Includes Refrigerant Gas Charging And Rep/replacement Of Required Spares Parts Like Pcbs, Refrigerrant Pipe, Compressors, All Type Of Relays, Motors, Thermostats, Capacitors, Solenoid Valve Etc. Through Oem Or Authorized Oem Service Dealer And Maintaing Records/ Documentation As Per Engineer Incharge And As Per Special Condition Of The Contract. Note - 1) 1 Job Equal To Acmc Of 1 No. Water Cooler With Inbuilt Ro For 1 Year. 2) In This Item, The Replacement Of Consumables Like Pf Candle Filter, Block Filter/carbon & Ro Membrane Are Covered Only One Times In A Year. Second Year" Replacement Of Block/carbon Filter 10 Inch For The Inbuilt Water Purifier Or As Per Oem Recommendation As And When Required. Replacement Of Pf Candel Filter 10 Inch For The Inbuilt Water Purifier Or As Per Oem Recommendation As And When Required. Replacement Of Membrane Filter For The Inbuilt Water Purifier Or As Per Oem Recommendation As And When Required. Dismantling Of Existing Split A.c/window A.c/tower A.c Of Different Rating / Capacity Up To 4 Tr From Existing Site Including Dismantling Of Stand, Stabilizer & Other Associated Accessories Etc, Refilling Existing Holes, Plastering, Finishing The Walls, Shifting Of The Removed Along With The Accessories Up To Store Room As Per The Direction Of Engineer Incharge And As Per Site Requirement. Installation Testing And Commissioning Of Split A.c/window A.c/tower A.c Of Different Rating /capacity Up To 4 Tr Including Making Holes, Plastering, Refrigerant Gas Charging, Connection With 4 Sq Mm Copper Power Input Cable From Nearest Power Outlet, Testing & Commissioning Etc As Per Site Requirement And As Per The Direction Of The Engineer In Charge. Supply And Installation Of Copper Refrigerant Pipe ( 1/2 Inch Plus 1/4 Inch ) Complete With Fitting Suction Line, Discharge Line With 12 Mm Thick Nitrile Rubber Insulation Between Indoor & Outdoor , Brazing Including Providing Of Clamps, Testing & Commissioning Etc. Complete As Required For 1.0/1.5 Tr Split Ac. Supply And Installation Of Copper Refrigerant Pipe ( 5/8 Inch Plus 3/8 Inch ) Complete With Fitting Suction Line, Discharge Line With 19 Mm Thick Nitrile Rubber Insulation, Brazing Including Providing Of Clamps Etc. Complete As Required For 2.0 Tr Split Ac. Supply And Installation Of Rigid Pvc/flexible Drain Pipe Of 25 Mm Dia With 6mm Heatlon/teflon Insulation Complete With Fittings & Accessories, U Straps Etc. Supplying & Fixing Of Approved Make Electrical Cable 3 Core X 2.5 Sq.mm Suitable For 1.5 / 2.0 Tr Split With Accessories Complete As Required. Providing And Fixing 12 Mm Nitrile Rubber Insulation On The Suction And Discharge Line Of The Existing Split Conditioners As Required. Providing And Fixing 19 Mm Nitrile Rubber Insulation On The Suction And Discharge Line Of The Existing 2.0 Tr Split Conditioners As Required.

30 Apr, 2025 ( 0 Days Left )

#TBR: 34365605

Power Plant

Supply Of Floor Standing Type 2t Cooling Capacity Tower , Installation Of 2t Single Phase Free Standing Tower Ac , Supply Of 12 Inch Soft Copper Tube With End Fittings And Insulation Sleeve , Supply Of 3c X 6 Sqmm Copper Pvc 1100v Grade Flexible Cable 15 Metres , Supply Of Heavy Duty Outdoor Stand Suitable For S. No 1 Item

24 Apr, 2025 ( 0 Days Left )

#TBR: 34340958

Construction

Rep And Maintainance Of 11 Tr X 2 Package And Allied Works Installed At Routine Icu Of Gmch

16 Apr, 2025 ( 0 Days Left )

#TBR: 34312900

Power Plant

Gem bids for 20 Supply Of Floor Standing Type 2T Cooling Capacity Tower Installation Of 2T Single Phase Free Standing Tower Ac Supply Of 12 Inch Soft Copper Tube With End Fittings And Insulation Sleeve Supply Of 3C X 6 Sqmm Copper Pvc 1100V Grade Flexible Cable 15 Metres Supply Of Heavy Duty Outdoor Stand Suitable For S. No 1 Item

24 Apr, 2025 ( 0 Days Left )

#TBR: 34274096

Services

Annual Maintenance Contract Amc For Ductable At Vasundara And Vanamali Kalyana Mandapams With Men & Materials At Svs Devasthanam, Dwarakatirumala For The Financial Year 2025-26

08 Apr, 2025 ( 0 Days Left )

#TBR: 34257196

Security Services

Gem Bids For 2 I Supply And Erection Of Water Cooled Shell & Tube Condenser For Blue Star Make Chilling As P Ii Supply And Erection Of Shell & Tube Evaporator For Chilling Of Plant Of G

15 Apr, 2025 ( 0 Days Left )