Supply Of Manufacture And Supply Of Wider Pre-stressed Concrete Sleeper For 25t Axle Load For B.g.60kg Uic/60 E1/52kg Running Rails With 60kg Uic/60e1/52kg Guard Rail On Bridge Approaches As Per Rdso Drg. No.t-8971 To T-8978, Alt-01 With Latest Alteration Etc..
Annual Repair And Maintenance Of New Suketi Bridge At Distt Mandi H.p. Sh- Construction Of Rcc Railing In Approaches Toward Mandi Town Side.
Sh Construction Of 40.00 Mtr Span Box Girder Bridge With Approaches Including Rodf Protection Work V Shape Drain Metalling And Tarring Balance Work Of 40.00 Mtr Span Double Lane Box Girder Bridge At Karada Khad On Rampur Gaura Mashnu Sarahan Jeori Road At Rd 35.825
Providing Di/Ms Make Manhole Covers, Rcc Cover Slabs, Repairs To Damaged Cc Approaches, Pot Filling In 1St To 6Th Division Of Municipal Corporation, Kakinada.
Providing Daily Construction Supervision & Quality Assurance For The Work Of Construction Of High Level Major Bridge With Limited Vertical Clearance Of 200Mm Across Uben River, Minor Bridge, Box Culvert And Approaches On Dhandhusar Ravani Chhatrasa Road Mdr Km.04/00 To 19/25 In Junagadh District.
Kjt-lnl:provision Of Dynamic Rockfall Barrier Of Capacity 5000kj & Boulder Netting At Various Vulnerable Locations On Hill Above Tunnel Portals & Approaches Between Kad-tkw Mid Line & Mhlc-jbc Up Line In Se Ghat Section.
Recovery And Reconstruction Of Sapkati Nagabandha Damaged Approaches Of Spt Br. No. 2/1. Under Ndrf Pdna -2022 For The Year 2025-26
Recovery And Reconstruction Of Autolabori To Chetuakhaity Road Damaged Approaches Of Spt Br. No. 3/1.under Ndrf Pdna -2022 For The Year 2025-26
Construction Of Vup Including Approaches Near Naibag Blackspot Id No.Ga-02-006 At Km. 485.345 On Nh-66 In The State Of Goa On Epc Mode Under Road Safety Annual Plan 2024-25. Reg- Hiring Of Vehicle For A Period Of 24 Months For Use Of Assistant Construction Of Vup Including Approaches Near Naibag Blackspot Id No.Ga-02-006 At Km. 485.345 On Nh-66 In The State Of Goa On Epc Mode Under Road Safety Annual Plan 2024-25. Reg. Hiring Of Vehicle For A Period Of 24 Months For Use Of Assistant
Construction Of 02 Lane Rob (end To End Including Approaches) In Lieu Of Lc No. 83 At Km 1032/9-11 And Lc No. 86-b At Km. 1040/09-11a Between Kanpur-etawah Section Of North Central Railway