Design And Costruction Of 300 Mtr Major Psc Balanced Cantilever Bridge At Km 105.00 Tawi Br Along With Its Approaches, Collection Of Hydraulic Data, Ssi, Proof Checking, Formulation Of Tentative Br Scheme On Du Road P Sampark In Jk On Epc Mode
Construction Of Approaches Rnb Wall At Bela Bridge Including Rotatory And Other Allied Works 2nd Call
Making Dust Suppression Arrangement By Spraying Water Over Road Surface At Old Surface At Old, New Railway Siding, Coal Transportation Road, Around All Chps Including Weigh Bridges Approaches At Ghugus Sub Area.
Design And Construction Of 60 Meter Major Pmt Bridge With Open Foundation And Psc Box Girder Superstructure Proposed Over Jhalong Khola River At Km 23.20, Including Ssi And Excluding Approaches On Road Chalsa-Jaldhaka-Bindu Barrage Under 87 Rcc/764Tf
Design And Construction Of 55 Meter Major Pmt Bridge With Open Foundation And Psc Box Girder Superstructure Proposed Over Pareng Khola River At Km 23.980, Including Ssi And Excluding Approaches On Road Chalsa-Jaldhaka-Bindu-Barrage Under 87 Rcc/764Tf
Design And Construction Of 50 Meter Major Pmt Bridge With Open Foundation And Psc Box Girder Superstructure Proposed Over Pareng Khola River At Km 23.640, Including Ssi And Excluding Approaches On Road Chalsa-Jaldhaka-Bindu Barrage Under 87 Rcc/764Tf
Maint/sopd-g/2025-26/135 1 Improvement Of Road From Jatiya Vidyalaya To Dakshin Rehabari And Pamelichupa Approaches 2 Improvement Of Road From Ext. Obk Road To Doloigaon Kuwara Under Sopd G For The Year 2025-26
Construction Of Twin Tube Uni Directional Bypass Tunnel Of Length 2.5 Km And Its Approaches Of 2.1 Km From Km 10.600 To Km 15.200 Package 2 On Sairang Phaibawk Section Of Nh 6
Construction Of Culvert Approaches Kaller Kasi W No 07
Construction Of Culvert Approaches At Bhagan Dass Mohalla W No 05