Disposal Of Coarse Wet Ash Collected At In Boiler Zero Meter Area And Open Area Near Esp Of 1x660mw Htps Kasimpur Through Sale
Ash Pond-clearing Thick Jungle Along The Ash Disposal Pipe Lines In Two Spells And Clearing Thin Jungle On Slopes Of Northern Ash Pond-i And Ii Including Rock Toe And Around Inspection Paths As And When Required During The Year 2025-26.
Supply Of 300nb Cast Basalt Spool Pieces And Tee Bends For Ash Slurry Disposal Lines In Wet Ash Handling System
Enquiry Of Work Contract For Compliance Audit By Auditors Outhorized By Cpcb To Undertake Compliance Audit For Ash Disposal By Sgtps, Mppgcl, Birsinghpur As Per Moef And Cc Notification No. 5481 E Dtd. 31.12.2021 For Ash Utilization.
Nctps Isemii Circle Ahp Dn Unit I Eco Hopper Renewal Of Existing Eroded And Damaged Ash Slurry Disposal Ms Pipe Line With Cast Basalt Pipes And Fittings In Unit I During Available Shutdown
Upkeep And Support In Dry And Wet Fly Ash Disposal System And Disposal System Drains Cleaning 2025 - 26
Gem Bids For Custom Bid For Services - 200141709 Biannual Maintenance Contract For Routine Patrolling, Overhauling And Breakdown For Ash Disposal Linesand Awrs System At Ntpc Barh St-i And St-ii
Overhauling Works In Unit Iii Eco Aph Hoppers Ash Disposal System Flushing Apparatus Rubber Expansion Bellow And Allied Sea Water Pipe Lines Fittings Valves And Rectification Work In Eco Aph Hopper Platforms 20
Providing Brick Masonry Pedestals For Extension Of Ash Disposal Pipe Lines Wherever And Whenever Required Inside Of Ab Pond Of Ktps-v And Vi Stages And Northern Ash Pond-i, Ii Of Ktps-vii Stage, Paloncha During The Year 2025-26.
Ttps Mech Ii Ahp Replacing The Clinker Grinder Feed Gate Assembly Power Cylinders And Its Connected Pipe Lines Feed Sump Hydraulic Ejector Assembly Etc In Unit Iii Bottom Ash Hopper Ash Disposal System During Annual Overhaul 2025 26