General Housekeeping In Ash Handling Plant Of Unit No 3 And 4 2x210mw Btps Parichha
Supply Of Ash Handling Spares - Nozzle Tip, Fogjet Nozzle, Discharge Flushing Nozzle, Wetting Head Assembly
Handling Of Boiler Collected Ash
Supply Of Spares For 200 Nb Branch Isolation Valve For Wet Ash Handling System V10-Supply Of Spares For 200Nb Branch Isolation Valve For Wet Ash Handling Systemm100028791
Procurement Of Spares For Torex Make Telescopic Spout Installed At Rcc Silo Of Ash Handling System Of U 5 And 6, Csctpp, Chhabra. Procurement Of Spares For Torex Make Telescopic Spout Installed At Rcc Silo Of Ash Handling System Of U 5 And 6, Csctpp, Chhabra
Job Work Of Fly Ash Handling For Boiler No 4 And 5
Job Work Of Fly Ash Handling For Boiler No 1 2 And 3
Gem Bids For Bulk Procurement Of Bag Filters For Ash Handling Plant
The Work Of Breakdown, Periodical, Preventive And Shut Down Maintenance Of All 6.6 Kv Ht Switchgear Of Main Plant Unit 3, 4Stage-Ii, Unit5, 6 Stage-Iii, Ash Handling Plant-Stage-Iii, Coal Handling Plant Including 6.6 Kv Ht 663 /P-2/Emp-W- 13108 Dtd 12.09.25
Supply Of Sleeve Couplings Of Sizes 200, 400 & 450 Nb For Ash Slurry Disposal Lines Of Ash Handling