Gem Bids For Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Industry Unit; Supply And Application Of Bottom Ash Hopper Refractory In Unit 4 During Annual Overhauling, Fy 26-27; Service Provider
Supply Of Seal Trough Regular Makeup Water Assembly For Unit Ii Bottom Ash Hopper
Mtps I Mii Circle O Ahs Bah Overhauling Of Clinker Grinders 6 Nos Bottom Ash Hopper Unit I And Ii
Removal Of Settled Ash Clinker In Unit Ii Iii Common Trench From Bottom Ash Hopper To Ash Handling Pump House And Interconnection Tunnel
Gem Bids For Repair, Maintenance, And Installation Of Plant/Systems/Equipments Version 2 - Industry Unit; Servicecontract For Supply And Installation Of Insulation Andcladding Sheet In Esp Hopper, Ash Handling Plant, Unit 3 &4; As Mentioned In Scope /
Ttps Mech Ii Ahp Renewal Of Worn Out Portions Of Bottom Ash Hopper Body Plate Connected Structural Supports And Bah Supporting Vertical Columns In North East And West Side Dismantling And Erection Of Bah Overflow Trough And Its Outlet Pipe Lines In
Ttps Mech Ii Ahp Replacing The Clinker Grinder Feed Gate Assembly Power Cylinders And Its Connected Pipe Lines Feed Sump Hydraulic Ejector Assembly Etc In Unit Ii Bottom Ash Hopper Ash Disposal System During The Forthcoming Annual Overhaul
Ttps Mechii Ahp Painting Of Unit Ii Bottom Ash Hopper Body Plate And Its Connected Structural Supports From 0 Mtr To 6 Mtr El During The Forthcoming Annual Overhaul
Evacuation Of Ash From The Boiler, Esp, Bottom Ash Hopper, I.d Fan Area, Related To Overhauling Of Unit # 06 At Ktps
Procurement Of 3 X 4 Jet Pump For Bottom Ash Hopper Drain Pit At Ash Handling Plant 2x660 Mw, Unit No. 3 And 4, Sstpp, Mppgcl, Dongalia.