Service Job For Line Laying, Rotation, Pump Erection And Other Associated Jobs For Installing Ash Water Recovery System Under Ahpmm Through Capex 2025-26.
Procurement Of 400 Nb Erw Pipe For Ash Water Recovery System Under Ahp-Mm Dept., Ktps Through Capex 25-26
Procurement Of Pump Set With Motor And Other Accessories For Ash Water Recovery System Under Ahp-Mm Dept., Ktps Through Capex 25-26.
Balance Job For Revival Of Integrated Ash Water Recovery System Of Ahp At Unit#6 Under Capex 2023-2024 At Stps.
Procurement Of Volute Liner For Ash Slurry Disposal And Recovery Water Pump Of Ash Handling System For 210 Mw, Atps, Mppgcl, Chachai.
Installation And Commissioning Of Ash Water Recovery System Under Capex 2025 2026
Handling And Maintenance Of Ash Water Recovery System Including Associated Work Of Recovery Well, Manholes And Decantation Channel Etc.
Revival Of Integrated Ash Water Recovery System Of Ahp At Unit-6
Construction Of Rcc Pit To Develop Ash Water Recovery System At Jhabu Ash Dyke Htps, Cspgcl
Tg Area, Boiler Area, Ldo And Hfo And Cw Pump House, Dm Plant And Ash Water Recovery System Etc. At Ghtp, Lehra Mohabbat Stage 1 2X210 Mw And Stage 2 2X250 Mw