Arrear Payment For Operation Guarding Works Of Different Piped Water Supply Scheme Auto Manual, Dg Set, Sub-Station
Operation and Guarding Works Of Different Piped Water Supply Scheme Auto Manual, Dg Set, Sub-Station, Security Guard, Mtu, Bottling Plant
Overhauling Of Boiler Instrument -Auto manual station for dearatore level controller ,Digital tamperature indicator for super heater model Tc 513 ,Drum level Indicator ,Air filter regulator of of H. P. Boiler ,Temprature sensor for H. P. Boiler ,Signal Isolator (Single/Dual Channel) ,Level transmeter/Drum level Transmeter for H.P Boiler drum liner ,Transmisson mainifold ,Composating high temprature cable. ,Control valve gland ABB make ,Pilot Relay valve for E/P Position ,Armoured signal cable 1.5 mm sq shielded ,Push fitting 1/4" 6 mm OD ,Push fitting 1/4" 8 mm OD ,Pneumetic Control valve for 40TPH Boiler ,Drum level Transmiter (Rose mount make) ,Pannel box ,Signal Cable 2 core ,24VDC/20A SMPS (PW723) ,24VDC/20A SMPS (PW722) ,24 VDC SMPS power supply And Annual Maintenance Contract -Field, Transmeter, Control Valve Positioner, Current To Pnemetic Converter & Pannel Controller And Digital Indicator.
SUPPLY OF Auto Manual Station For Boiler Automation Integration With Blr Dcs For 2023-24