Improvement And Development Of Road And Berm Strengthening With Remodeling Of Drain From H.no. 1/43 To Main Rothak Rd. At Road No.43 By Pdg. Bituminous Macadam, Bituminous Concrete, Bitumen Emulsion, Road Marking Strips, Brick Work, Precast Slab, Rcc
Upgradation Of Existing Road And Side Berm Strengthening From H.no.2 To H.no.36 Punjabi Bagh By Pdg. Bituminous Macadam, Bituminous Concrete, Bitumen Emulsion, Road Marking Strips Etc. At Road No.64 In Ward No.92 Punjabi Bagh/wz.
Strengthening Of Road And Berm From 39/54 Punjabi Bagh Near Shiv Mandir, Madipur To North Avenue Road In Ward No.92/wz By Pdg. Bituminous Macadam, Bitumen Concrete, Bitumen Emulsion, Road Marking Strips Etc. From In Punjabi Bagh Sh-1 Remodelling An
Strengthening Of Road And Berm From 39/54 Punjabi Bagh Near Shiv Mandir, Madipur To North Avenue Road In Ward No.92/Wz By Pdg. Bituminous Macadam, Bitumen Concrete, Bitumen Emulsion, Road Marking Strips Etc. From In Punjabi Bagh Sh-1 Remodelling An
Supply And Laying Of Stone Metal Bitumen Macadam And 30mm Thick Bitumen Concrete For Pot Holes
Supply And Delivery Of Bitumen Penetration Macadam With Hard Stone Aggregate Br/Ihb-Dhar/71129/Site/ Bitumen/Nit/01
Sh Formation Cutting And P/L G.Sb., W.M.M., Bitumen Macadam And Bituminous Concrete In Km. 0/000 To 2/500
CONSTRUCTION & LAYING 400MTR, 8 LANE SYNTHETIC ATHLETICS TRACK - Synthetic Athletic Track Normal Stress Area , Synthetic Athletic Track High Stress Area , Sand filling in jumping pits , Earth Work , Cover Laying Pipes, cables etc , Filling available excavated earth , Concrete Work , Steel Centering and shuttering , Steel Work , Drainage Work , Brick Work , Finishing , Finishing Neat Cement Punning , Road Work , Spreading and compacting specified grade Granular sub base , Wet mix macadam , Tack coat , Bitumen Surface , Laying Bituminous macadam , Llaying dense bituminous concrete , Thick cement concrete slab , Providing and fixing concrete Kerb stones , Weedicide over the prepared subgrade , Long and Triple jump trough casing Aluminium , Long and Triple jump take off board , Long and Triple jump Blanking Board , Long and Triple Jump stencils , Long and Triple Jump Control Strips , Long and Triple Jump plasticine , Long and Triple Jump Training strips , Water Jump Hurdles , High Jump Landing base , High Jump Pit with uprights and cross bar , Hammer cum discuss ring with cage , Shot Put Ring , Shot Put board , Pole Vault box with cover, uprights cross bar and landing area , Pole vault boxes , Cover for pole vault boxes , Take off tray , Dummy board with synthetic top , Aluminum Kerbing , Sand Pit , Chain Link Fencing , Centering and shuttering , Providing and laying in position cement concrete , Reinforced cement concrete , Structural steel work riveted , Painting with synthetic enamel paint , Providing and fixing G.I. chain link , Flood Lighting
Sectioning Solid Block Masonry Providing And Laying Bitumen Penetration Macadam Providing And Applying Tack Coat Providing And Laying Seal Coat Earth Work In Excavation Pcc Demolishing Brick Laterite Plastering Painting 220Kv Substation Kunnamangalam
Providing And Laying 50Mmthick Dense Graded Bitumen Macadam Nd 30Mm Thick Marking Of Center Line