"नये भारत का नया Tender Portal"
Request a call back

Latest Tenders for body bolster

Total 49 tenders found
#TBR: 33648030 Closed

Railway Transport

  • Maharashtra
  • Due On: 07 Jan, 2025 (0 Days Left)

Supply of Side Bearer On Body Bolster As Per Icf Drg. No.T-1-1-740, Col.1 Alt.G/19. Warranty Pe Riod: 30 Months After The Date Of Delivery

Ref. Document
View Tender
#TBR: 33569632 Closed

Railway Transport

  • Tamil Nadu
  • Due On: 06 Jan, 2025 (0 Days Left)

Supply of Channel Complete For Body Bolster.

Ref. Document
View Tender
#TBR: 33378246 Closed

Railway Transport

  • Punjab
  • Due On: 04 Dec, 2024 (0 Days Left)

Supply of Set Of Front End Part, Head Stock Arrangement & Body Bolster For Vande B Harat Dtc Coaches., As Per Drawing: Mp24frontdtc Version 0, Packing Instruction: No Special Packing Required. The Protruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are To Be Protected With Suitable Covering To Prevent It From Damage. However Transi T Damage If Any Shall Be At The Cost Of Supplier. Warranty Period: 30 Months After The Date Of Delivery

Ref. Document
View Tender
#TBR: 33370134 Closed

Railway Transport

  • West Bengal
  • Due On: 30 Nov, 2024 (0 Days Left)

Supply of Top Side Bearer On. Top Side Bearer On Body Bolster Complete To Icfs Drg No. F-1-1-019, Col.No- I, Alt.No -Q/16.Or Latest. Warranty Period: 30 Months After The Date Of Delivery

Ref. Document
View Tender
#TBR: 33306270 Closed

Railway Transport

  • Tamil Nadu
  • Due On: 10 Dec, 2024 (0 Days Left)

Supply of One Coach Set Of End Part For Air Conditioned Emu Trailer Coaches To Drg. Nos. Emu/C/Ac-1-1-002, Col-Iii, Alt C -1 No. Emu/C/Ac-1-1-003, Col-I, Alt B -1 No. Special Condi Tion: I The Manufacturing Facility Requirement As Per Icf/Md/Spec-147, Issue Status-01, Re V-02, Amendment No.01. Ii Body Bolster To Drg.No.Icf/Mrvc/C/Ss-1-1-005, Alt H, Col.I To Be Provided Without Aside Bearers To Drg.No.Emu/M-1-1-027, Alt L Col-Ii. Bgrubscrews To Dr G.No.Icf/Mrvc/C/Ss-1-1-005, Alt H Item-8, And Cside Bearer Covers To Drg.No.Emu/M-1-1-027, Alt L Item-1. Iiithe Under Frame End Part Should Be Supplied With Normal Side Up And Side Bearer Side Down. Suitable Packing To Be Done To Prevent Damage During Transit, Unloa Ding And Rust Prevention During Storage. Safety Item Warranty Period: 30 Months After T He Date Of Delivery Quantity Tolerance +/-: 5 %Age, Item Category : Normal, Total Po Value Variation Permitted: Max 8 Lacs

Ref. Document
View Tender
#TBR: 33285840 Closed

Railway Transport

  • Tamil Nadu
  • Due On: 22 Nov, 2024 (0 Days Left)

Supply of Side Bearer On Body Bolster In Icf Conventional Coaches As Per Icf Drg. No.T-1-1-740, C Ol.1 Alt.G/19. Warranty Period: 30 Months After The Date Of Delivery Quantity Tolerance +/-: 5 %Age, Item Category : Normal, Total Po Value Variation Permitt Ed: Max 8 Lacs

Ref. Document
View Tender
#TBR: 33272718 Closed

Railway Transport

  • Tamil Nadu
  • Due On: 15 Nov, 2024 (0 Days Left)

Supply of Body Bolster To Drg.No. Icf/Mrvc/C/Ss-1-1-005, Col.I, Alt H Except Side Beare R, Item-7 & Grub Screw, Item-8. The Firm Shall Fulfil The Requirement As Per Icf/Md/Spec-14 7, Issue Status: 01, Rev-02 With Amendment No: 1. Special Condition : Packing Condition Is As Per Drg.No. Icf/J&T/Sk-1769, Alt A Warranty Period: 30 Months After The Date Of Delivery Quantity Tolerance +/-: 5 %Age, Item Category : Normal, Total Po Value Variation Permitted: Max 8 Lacs

Ref. Document
View Tender
#TBR: 33261609 Closed

Railway Transport

  • West Bengal
  • Due On: 15 Nov, 2024 (0 Days Left)

Supply of Top Side Bearer On Body Bolster Complete To Icfs Drg No. F-1-1-019, Col.No- I, Alt.No -Q/16.Or Latest. Warranty Period: 30 Months After The Date Of Delivery

Ref. Document
View Tender
#TBR: 33213547 Closed

Railway Transport

  • Tamil Nadu
  • Due On: 27 Nov, 2024 (0 Days Left)

Supply of End Parts For Memu/Tc6 Under Frame To Drg. No. Memu /Tc6-1-1-005, Alt B Col .1 The Firm Shall Fullfil The Requirement As Per Icf/Md/Specn.147, Issue Status-01, Rev.02 With Amendment No.1. Special Condition : Body Bolster To Drg. No.66311053, Col.I Alt B To Be Provided Without A Side Bearers To Drg. No.56711031, Alt A The Under Frame End Par T Should Be Supplied With Normal Side Up And Side Bearer Side Down. Suitable Packing To Be Done To Prevent Damage During Transit, Unloading And Rust Prevention During Stora Ge. Warranty Period: 30 Months After The Date Of Delivery Quantity Tolerance +/-: 5 %Age, Item Category : Normal, Total Po Value Variation Permitted: Max 8 Lacs

Ref. Document
View Tender
#TBR: 33179669 Closed

Railway Transport

  • Tamil Nadu
  • Due On: 06 Nov, 2024 (0 Days Left)

Supply of Gas Argon Co2 Mixture For Spm Body Bolster. Argon Mixed With Co2 At Arati O Of 80% And 20% With Manufacturers Certificate For Gas Compositionfor Use In Roboti C Welding Machine. Warranty Period: 30 Months After The Date Of Delivery

Ref. Document
View Tender
Download Document