Grass Vegetation Removal And Antiweed Spray In 400kv Switch Yard And In Bay No 413 And 415 Of Dtl Yard, Main Plant And Bop Area At Pps-iii Bawana
Upgradation Of Road From Umarpur Chowmatha To Pakhiora Bop Road Under Hanskhali Block Sl05
Civil Structural And Architectural Works Of Bop Package And Switchyard At 2 X 660 Mw Cspgcl West Tpp Chhatisgarh India
Providing Chain Link Fencing Along With Sentry Post At Bop Bp-42 Of 59Th Bn Ssb Nanpara Under Frontier Lucknow.
Insulation Work Of Mt Garrage At Bop Of 15Th Bn Itbp An Altitude 4268 Mtr And Distance From Leh 233 Km Road Connected Bop Itbp/Shq Snr/Engr/15Th Bn/Mt Shed Dungti/185/2025/11323-28 Dtd 02/12/25
Insulation Work Of Mt Garage At Bop Of 15Th Bn Itbp An Altitude 4366Mtr And Distance From Leh 215 Road Connected Bop Itbp/Shq Snr/Engr/15Th Bn/Mt Shed Rango/186/2025/11629-36 Dtd 02/12/25
Insulation Work Of Mt Garage At Bop Of 15Th Bn Itbp An Altitude 4389 Mtr And Distance From Leh 255 Road Connected Bop Itbp/Shq Snr/Engr/15Th Bn/Mt Shed T-Male/184/2025/11637-42 Dtd 02/12/25
Construction Of Cook House And Dining Hall At Bop Gompa Of 25Th Bn, Tezu, Ar. P.
Providing Installation Testing And Commissioning Of 25 Kwp Off Grid Solar Power Plant At 16 Bops Of 13 Bn Now 51 Bn Bsf Of Shq Bsf Barmer Under Ftr Hq Gujarat Including Construction Of Rcc Framed Structure For Battery Room
Optical Fiber Cable Construction/Ofc Laying At Nurekhan Ki Chaki To Bharewala Exch 19 Km And Ramdevra T Joint To Ramdevra Exchange 3.5 Km Backhaul Work Bops Of Jaisalmer Oa Of Jodhpur Ba