Gem Bids For Manual Kiln Inside Excess Coating Breaking , Normal Coating Breaking , Bricks Shifting From Brick Store Room To Burner Platform , Bricks Shifting From Burner Platform To Inside Kiln Lining Area Up To 20m , Bricks Shifting From Burner Platform To Inside Kiln Lining Area 20 To 40m , Bricks Shifting From Burner Platform To Pre-heater Up To 3rd Floor , Bricks Shifting From Burner Platform To Pre-heater Up To 7th Floor , Bricks Shifting From Brick Store Room To Nearby Cooler Area , Brick Lining And Castable Work Inside Kiln, Preheater And Cooler Etc
Fdr / Mtc. Of..Kmip/ Sh -Repair Strengthening Of Canal Embankment And Cd Structure Of The Right Bank Main Canal Under Uttar Krishnapur Gp Of Teliamura Rd Block..2025-26 By Earth Filling, Rcc Work, Brickwork, Brick Lining, Plastering And Other Allied
Gem Bids For 992 Manual Kiln Inside Excess Coating Breaking Normal Coating Breaking Bricks Shifting From Brick Store Room To Burner Platform Bricks Shifting From Burner Platform To Inside Kiln Lining Area Up To 20m Bricks Shifting From Burner Platform To Inside Kiln Lining Area 20 To 40m Bricks Shifting From Burner Platform To Pre-heater Up To 3rd Floor Bricks Shifting From Burner Platform To Pre-heater Up To 7th Floor Bricks Shifting From Brick Store Room To Nearby Cooler Area Brick Lining And Castable Work Inside Kiln Preheater And Cooler Etc
Extension Of Brick Work Lining Of Watercourses Of O/l Outlet Rd No 47615-l Of Sarih Distributory
Work Of 1st Class Brick Lining From 0.350 To 0.850 Km In The Main Canal Of Korantadih Pump Canal Located In Sohanv Development Block, To Be Completed In Accordance With Departmental Drawings And Standards Including Construction Material (except Cement And Bricks), Labour And Equipment
First Class Brick Lining Work 1 3 In Malokhar Minor From 0.470 Km To 0.770 Km At Kunda Kala Pump Canal Including All Cost Of Material, Excluding Cement Labour, T And P Used, Complete In All Respect As Per Drawing Provided By Department.
First Class Brick Lining Work 1 3 Cm In Mawai Minor From Chainage 0.375 To 0.725 At Kundakala Pump Canal Including All Cost Of Material, Excluding Cement Labour, T And P Used, Complete In All Respect As Per Drawing Provided By Department.
First Class Brick Lining Work 1 3 Cm In Mawai Minor From Chainage 0.025 To 0.375 At Kundakala Pump Canal Including All Cost Of Material, Excluding Cement Labour, T And P Used, Complete In All Respect As Per Drawing Provided By Department.
Custom Bid For Services - Fire Brick Lining Work Breaking Of Coating In The Kiln And Castable Work In Different Areas Of Kiln And Coolers And Preheater Section
Brick Lining Work Of Umarana Minor Canal From 118.0 M To Start Of Syphon 156.0 M Of Canal, Work Includes Dressing Of Canal Bed And Dowel By Cart Work In Cutting Portion Then Compaction As Per The Required Section Of Canal, Preparation Of Sab Grade Then Laying Local Sand After That 11 Cm Brick Work, Plaster On Bed & Slope Of Minor, Pointing On Brick Work At Top Of Minor, Making Cutt Off Wall At Every 10 Mar Distance, Making Toe Wall As Per The Drawing And Direction Of Engineer-In Charge Including All Cost Of Material. Labour T&P Required For Proper Completion Of Work At Rajapur Pump Canal