Repairing Of Brick Pitching Between Km. 4.200 To Km. 4.300r/bank Of Nirpura Dy.
Construction Of Brick Pitching Between Km. 3.300 To Km. 3.350both Bank Of Nirpura Dy.
Repairing Of Brick Pitching Between Km. 7.400 To Km. 7.450both Bank Of Nirpura Dy.
Brick Pitching Work From Km 6.550 To Km 6.710 Of Minor Malandi.
Raising Of Ballast Retaining Wall, Provision Of Bridge Table, Inspection Steps Including Pitching Of Slopes, Drains, Brick Lining Under Aden/Pendra.
Jp Division :- Rcc Toe Wall, Rrm Boundary Wall And Brick Masonry Boulder Pitching And Geogrids To Stop Soil Erosion Near Ohe Foundations Over Jaipur Division
Aden/sikr Section:- Providing Stone/brick/ Pitching/ Toe Wall For Stabling Of High Track Embankment Slope In Sikr-cur & Repairs To Cess And Bank Slope In Track Under Aden/sikr Section.
Strengthening And Resetting Of Dry Brick Pitching In Damaged Sundarban Embankment For A Total Length Of 0.54 Km Along The Left Bank Of River Dansa At Mouza- Dhanikhali 0.54 Km In Block And P.s-hingalganj Under Basirhat Irrigation Division, Dist- No
Protection Work By Brick Pitching Along Left Bank Of River Nonagong From 1.800 Km To 2.600 Km At Mouza - Ghosalabad, Gp-deganga-ii, Block- Deganga
Raising, Strengthening Of Left Embankment Of Outfall Channel Of Akharpur Khal With 20 Cm Thick Dry Brick Pitching For A Length Of 60 Metre