Illumination Of All Govt Buildings/ Bridges/ Flyovers During Independence / Republic Day Celebration Kashmir Division Under Ut Capex 2025-26
Construction Of Bridges In Sivasagar District I Br No 1/1 On Namdang Gohain Gaon Road Sivasagar/09A Construction Of Bridges In I Br No 1/1 On Namdang Gohain Gaon Road
Recovery And Reconstruction Of Kathal Road From Ch.1500.00M To Ch.2000.00 M Ch.3000.00M To 3500.00M In Stretches Bridges Of Kathal Road Under Ndrf Pdna 2022 For The Year 2025-26 Pdna/Cachar/01
Preparation Of Drawing And Design Of Bridges Under Nh Division Kondagaon
Repair And Rehabilitation Of Bridges At Ch. 108.188 Km Of Ramjibanpur-Palita-Palitpur-Natunhat Road Sh-7 Under Ramjibanpur Highway Sub-Division Of Burdwan North Highway Division In The District Of Purba Bardhaman During The Year 2025-2026. Wbpwdroadseebnhdnit09/25-26-1
Procurement Of Bailey Bridge Components Required To Be Installed At Various Upcoming Bridges.
Survey, Boring Work And Preparation Of Gad Of Fly Overs/railway Over Bridges/river Bridges Under Bridge Construction, Subdivision Bhopal-1
Rehabilitation Of Existing Steel Joist Bridge Due To Corrosion And Weathering Action Of Eight Nos Joist Bridges I.E. Bhutkura Bridge At 06Th Km Of Patgram Bhutan Cross Road, Giria Bridge At 8Th Of Patgram Bhutan Cross Road, Bherbhari Bridge Etc..Etc. Rehabilitation Works
Construction Of 2 Nos. Of Foot Bridges In Nagar Van Kesar Galla Of Rajouri Forest Division.
Painting The Existing 7 Nos Of Foot Over Bridges And Rectification Of The Damaged Structural Portions Of The Fob At Indira Nagar, Kandanchavadi, Perungudi, Seevaram, Mettukuppam, Ptc And Karapakkam Km 1.3 To 10.9 Including Cost Of Materials And Labor Painting The Existing 7 Nos Of Foot Over Bridges And Rectification Of The Damaged Structural Portions Of The Fob