Construction Of New Broad Gauge Line Between Mid Section Km:5.72 And Kuppam Incl. Km:23.869 Under Marikuppam -kuppam New Line Project 23.7 Km Including Civil & Track Works, Signal & Telecommunication Works, Railway Electrification And Electrical General Services On Epc Mode.
Rfp For Construction Of New Broad Gauge Line Including Electrical, Signal & Telecommunication Works Between Jumlapur Road Excl Ch: 75400 And Gurguntaincl Ch: 134950 59.55 Km Under Gadag-wadi New Line Project On Epc Mode.
Construction Of A New Broad Gauge Railway Line Between Maluguru Chainage - 1906.6 Ch: 108125 Of Ynk-pkd To Palasamudram Chainage 17/150 Including 02 New Yards Chalivendala & Palasamudram And Existing Maluguru Yard Modification With A Route Length Of 19.057 Km Including Signal & Telecommunication, Electrification & Electrical General Service Works
Conversion Of 33kv / 11kv Overhead Power Lines / Lt Distribution Lines Into Underground Cable Lines Including Replacement / Relocation Of Associated Lines & Distribution Transformers With H-beam, Pcc Poles Structure / Lines To Remove Infringement Of Alignment Of New Electrified Broad Gauge Railway Line Between Pipaliya Nanker 129.000 Km To Budhni 198.000 Km Section In Bhopal Division Of West Central Railway In The State Of Madhya Pradesh, India.
T.No.Dyce-C-Ii-Ju-T-10R-Luni-Smr-Bldi - Laying And Linking Of Broad Gauge Main Line, Including Points And Crossings, Spreading Of Ballast, Tamping Of Track, Transportation Of P.Way Materials And Other Ancillary Works From Modran Including Km 92.000 To Marwar Kori Including Km 133.000 In Connection With Luni-Smr-Bldi Doubling Project Of North Western Railway.
T.No.Dyce-C-Ii-Ju-T-13-Luni-Smr-Bldi - Laying And Linking Of Broad Gauge Main Line, Including Points And Crossings, Spreading Of Ballast, Tamping Of Track, Transportation Of P.Way Materials And Other Ancillary Works From Bishangarh Excluding Km 49.000 To Modran Excluding Km 92.000 In Connection With Luni- Smr-Bldi Doubling Project Of North Western Railway.
Construction Of New Broad Gauge Line Between Chainage 66400 & Chainage 90000 23.600 Km Including Civil & Track Works, Signal & Telecommunication Works, Railway Electrification And Electrical General Services Between Tavarekere Excl. & Hiriyur Excl. Stations In Tumkur-chitradurga-davangere New Line Project.
Engineering Procurement And Construction Epc For Construction Of New Broad Gauge Railway Line Between Chainage 12/800 & Chainage 30/500 Including Civil Works, Signal & Telecommunication Works And Electrical General Services Between Urukereexcl. And Koratagere Incl. Stations And Railway Electrification Between Tumakuru0/000 & Koratagere30/500 In Tumakuru-rayadurga New Line Project
Civil Engineering Works, Electrification Works And Signalling Works Of New Single Broad Gauge Line In Kamarpara-hilli Section Length: 15.187 Km In Connection With Construction Of Balurghat-hilli New Bg Railway Line Project Of Northeast Frontier Railway Construction On Epc Mode
Site Investigation, Collection Of Field Data, Analysis, Preparation Of Drawings, Design In 6 Copies, Rectification Of Alignment For Tunnel 25 And Tunnel 26 And From Tunnel 27 Portal 2 To Tunnel 1 Portal 1 At Tupul Yard. The Scope Includes Desk Studies, Traverse Mapping, Geophysical Surveys, Sub-Surface Investigation, Geological Investigation, Geological Global Stability Analysis, Logging, Report Preparation, And Supervision During Construction Of Tunnel No. 25 & Tunnel No.26 And Proposed Structures In Tupul Yard From Tunnel 27 Portal 2 To Tunnel 1 Portal 1, Major Bridges, Under The Jurisdiction Of The Deputy Chief Engineer Construction - 4, 3- Imphal, Deputy Chief Engineer/Jiribam In Connection With Construction Of Jiribam- Imphal New Broad Gauge Line Project Manipur Of North East Frontier Railway.