Supply Of Revised Irs Side Buffer Casing For Coach.
Transportation Of Light Melting Scrap Lms Consists Of A Under Frame Of Wagon; B Uic Bogie Frames Without The Spring Helical And Leaf Spring; C Cast Steel Bogie Frame Casnub Bogie Without Helical/Leaf Spring; D Buffer Plungers Without The Helical Springs And Rubber Buffer Pad, Pads, Buffer Casing; E Draw Bars And Brake Beams Of Coaches/Wagons; F Axle Guards And Wagon Doors; And G Box Wagon Body Cutting Etc. From Various Railway Units To Rail Wheel Plant, Vill - Bela, P.O.- Arvind Nagar, Dist.- Saran, Bihar Under Distance Slab 0-500 Km Taking Average Lead Distance 250 Km.
Procurement Of Revised Irs Side Buffer Casing For Coaching Stock Casting Etc..
Supply of Side Buffer Casing Casting.
Supply Of Revised Irs Side Buffer Casing.
Supply of Pallet For Buffer And Buffer Casing.
Procurement Of Revised Irs Side Buffer Casing For Coaching Stock Casting To Rdso Drawing No. Sk-94043, Alt. 5. Material & Specification As Per Drawing..
Supply Of Revised Irs Side Buffer Casing For Bg Coaching Stock Etc..
Supply Of Revised Irs Side Buffer Casing For Coaching Stock Casting.
Supply Of Side Buffer Casing Casting For Coaching Stock..