Rewinding And Heat Varnishing Of Burnt Out Stator Of Abs Make Submersible Pump Unit No.1 With Allied Works At Ambedkar Bridge Drainage Pumping Station
Rewinding Of 14 Fourteen Nos. Of Burnt Induction Motors Stator Of Moonidih Coal Washery.
Rewinding And Heat Varnishing Of Burnt Out Stator Of Submersible Pump Unit No. 3 6 Cusec /45 Kw/ 415Vwith Others Allied Electrical Works
Repairing Of Old And Usec 3 Phase Induction Submersible Pump And Moter Set Of Below Maintained Capacity By Lifting, Carriage From Working Place To Cutside Workshop, Repairing Of Motor Job Stator And Rotar By Dismantling And Replacing Of Sleeve, Gun Metal Bush, Gun Metal Thrust Bearing In Lower Housing And Upper Housing, Repairing Of Pump By Cismantling Impeller Shaft From Bowl Assembly And Replacing G.M. Bush Neckring, G.M. Bush, Rewinding Of Stator With New Pvc Insulated Super Enamelled S.E. Copper Wire By Cutting And Taking Out Burnt Winding Wire From Stator When Burnt Pvc Insulated/ Super Enamelled S.E. Copper Wire Will Not Be Return To The Department By Contractor Testing On Load After Assembling Of Stator Rotor Pump And Fitting It To Working Alace Including All Cost Of Materials T&P And Labour Complete In All Respect
Complete Rewinding, Heat Varnishing And Overhauling Of Burnt Out Stator Including Replacement Of Broken Bearings Of Motor Pump
Job Contract For E And M Installations - Providing Maintenance Services And Operation Of Electrical And Mechanical Installations, Providing Maintenance Services And Operation Of Glf Systems, Providing Of Computer Operator, Complete Re-Winding Of Burnt Out Stator Coils, Cleaning And Painting Of Street Light Tubular Pole Including Light Fitting Bracket And All Other Associated Accessories, Painting Of Collar Of Street Light Pole, Painting Of Glf Fittings, Painting Of Outdoor Feeder Panel Or Lt Panel, Replacement Of Damage Street Light, Carrying Out Of Dsr Item
Job Contract For E And M Installations At 11 Kv Substation And Water Pump House And Allied Works - Providing Operation And Maintenance Services Of Electrical And Mechanical Installations, Day To Day Operation And Maintenance Of Water Pump House, Providing Of Computer Operator, Filtration And Dehydration Of Insulation Oil Of Existing Ht Installations, Servicing Testing Checking And Calibration Of Relay, Calibration And Testing Of 8 Nos Air Circuit Breaker, Complete Cleaning Of Jack Well, Complete Overhauling And Repairing Of Water Pump, Complete Rewinding Of Burnt Out Stator Coils Of Induction Motor, Complete Repairing Of 11Kv Gang Operated Switch, Replacement Of Damage Gate Valve, Replacement Of Damage Foot Valve, Replacement Of Damage Non Return Valve, Dsr Item Works As Scheduled In Dsr
Rewinding And Heat Varnishing Of Of Burnt Out Stator Of Submersible Stand By Pump Unit No 4 8.33Cusec /45 Kw/ 415Vwith Others Allied Electrical Works In Panel Unit At Topsia Point A D.P. Station
Auction Sale Of Pump Set, Vt Motor, Valve Assembly, Stator, Burnt Pvc Coated Tow Wire, Acc Burnt Iron Wire, Steel Scrape
Re-Winding Of 09 Nine Nos. Of Burnt Induction Motors Stator Of Moonidih Coal Washery.