"नये भारत का नया Tender Portal"
Request a call back

Latest Tenders for bus duct

Total 314 tenders found
#TBR: 36226033 Live

Power Plant

  • Telangana
  • Due On: 14 Jan, 2026 (6 Days Left)

Supply Of Protecting Compounds For Rubber Bellows Of Isolated Phase Bus Duct

3.32 Lacs
View Tender
#TBR: 36218475 Live

Electronics

  • Karnataka
  • Due On: 09 Jan, 2026 (1 Days Left)

Gem Bids For Rubber Bellow / Expansion Joint For Bus Duct Main (id= 1000 Mm) , Rubber Bellow / Expansion Joint For Bus Duct Main (id= 1000 Mm) , Height (200 Mm Required) , Rubber Bellow / Expansion Joint For Bus Duct Auxiliary (tap Off) (id= 650 Mm)

Ref. Document
View Tender
#TBR: 36174988 Closed

Power Plant

  • Tamil Nadu
  • Due On: 05 Jan, 2026 (0 Days Left)

Ttps Es Circle Em I Annual Maintenance Of Transformers And Generator Bus Duct Of Unit Ii During The Annual Overhauling For The Year 2025 2026

Ref. Document
View Tender
#TBR: 36157816 Live

Power

  • Rajasthan
  • Due On: 07 Jan, 2026 (0 Days Left)

Gem Bids For Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, 220kv Switchyard Three Phase Manual Isolators (ds) Preventative Maintenance (total Quantity 1 Is Equal To 19 Numbers .. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, 220kv Switchyard Three Phase Motorized Isolators (ds) Preventative Maintenance (total Quantity 1 Is Equal To 17 Numbe.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Assistance In Preventative Maintenance Of Three Phase 220kv Sf6 Circuit Breaker (total Quantity 1 Is Equal To 10 Numb.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Assistance In Preventative Maintenance Of 220 / 132 Kv Three Phase Mocb (total Quantity 1 Is Equal To 2 Numbers For T.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Cleaning And Tightness Of 220 Kv Switchyard Single Tension / Suspension String For Single Conductor (total Quantity 1.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Cleaning And Tightness Of 220 Kv Switchyard Double Insulator Suspension String For Single Conductor (total Quantity 1.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, 220kv Switchyard Overhead Connectors (t Connection), Clamp / Joints Inspection, Cleaning And Tightness Checks And Rep.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, 220kv Switchyard Overhead Connectors (y Connection), Clamp / Joints Inspection, Cleaning And Tightness Checks And Rep.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, 220kv Line Tension Insulator Cleaning And Tightness Of Wall Bracket For Support At Tb Wall (total Quantity 1 Is Equal.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Cleaning And Tightness Of Sky Ground Wire Connections (tower Top And Ground) (total Quantity 1 Is Equal To 51 Set For.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, 220kv Switchyard Insulators Cleaning, Inspection And Connection Tightness Of Ct / Pt / Cvt / La / Sut / Gt Hv Bushin.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Assistance For Disconnection And Connection Of 220kv Ct / Pt / Cvt / Gt / Sut / Ut Terminals For Diagnostic Testing O.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, 220kv Line Wave Trap Cleaning, Inspection And Connection Tightness (total Quantity 1 Is Equal To 7 Numbers For Two Ye.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, 220kv Switchyard Bus Post Insulators (vertically Mounted On Ground) Cleaning, Inspection And Connection Tightness (to.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, 21 Kv Isolated Phase Bus Duct Cleaning, Inspection And Connection Tightness And Replacement Of Gasket And Sealing Etc.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, 220kv Switchyard Overhead Aac Strained All Aluminum Conductor / Jumper Replacement Up To Twenty Meter Length Piece (t.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Replacement Of 220 / 132 Kv La (total Quantity 1 Is Equal To 6 Numbers For Two Years); As Per Scope Of Work And Atc , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Replacement Of Single Tension / Suspension String / Wave Trap (of 220kv Switchyard) For Single Conductor (total Quant.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Replacement Of Double Insulator Suspension String Set (of 220kv Switchyard) For Single Conductor (total Quantity 1 Is.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Replacement Of 220kv Switchyard Bus Post Insulator (total Quantity 1 Is Equal To 2 Numbers For Two Years); As Per Sco.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Replacement Of Insulator Of 220kv Switchyard Isolator (ds) / Ct / Pt / Cvt) I.e. Complete Unit Of One Phase (total Qu.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Replacement Of Sky Wire (60 Meter Length Each) Of 220kv Switchyard (total Quantity 1 Is Equal To 5 Numbers For Two Ye.. , Repair, Maintenance, And Installation Of Plant Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Replacement Of 245 Kv Sf6 Cb / Mocb Complete Unit Of One Phase / Pole (total Quantity 1 Is Equal To 3 Numbers For Two.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Replacement Of Overhead Aac Strained All-aluminum Conductor Of 30 Mm Diameter Replacement Up To 160 Meter Length Piec.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Site Visit Charges Of Four Persons From Bidders Premises To Rr Site Unit 1 And 2, For Carrying Out The Operational Em

29.00 Lacs
View Tender
#TBR: 36154850 Live

Power Plant

  • Madhya Pradesh
  • Due On: 16 Jan, 2026 (8 Days Left)

Various Work Of Esp, 400 Kv Switchyard And Bus Duct During Aoh Short Shutdown Of Unit No 10, Stps

9.82 Lacs
View Tender
#TBR: 36108513 Closed

Crude Oil / Natural Gas / Mineral Fuels

  • Haryana
  • Due On: 26 Dec, 2025 (0 Days Left)

Gem Bids For Custom Bid For Services - 9060C25d45 Rprc255397replacement Of Sandwich Bus Duct By Cables Oftransformers In Substation 61 62 36 At Panipat Refinery /

28.43 Lacs
View Tender
#TBR: 36043683 Closed

Power Plant

  • Tamil Nadu
  • Due On: 11 Dec, 2025 (0 Days Left)

S.42 Nctps Ii Es Circle Em I Division - Sub Division Cleaning And Tightness Checking Of 11Kv 415V Switchgear Buses And Outgoing Cables 11Kv 3 3Kv Spbd Bus Duct Gcb Dry Type Transformers During The Annual Overhauling Of Unit I For The Year 2025 20

Ref. Document
View Tender
#TBR: 35967323 Closed

Power

  • Rajasthan
  • Due On: 08 Dec, 2025 (0 Days Left)

Work Contract For Routine, Breakdown Repair And Annual Maintenance Of Power Transformers, Service Transformers, Reactors And Isolated Phase Bus Duct Of Unit-1, 2, 3 And 4 4X250mw Stage-I, Phase-Iandii Ctpp, Chhabra For A Period Of 12 Months

34.59 Lacs
View Tender
#TBR: 35953976 Closed

Crude Oil / Natural Gas / Mineral Fuels

  • Uttar Pradesh
  • Due On: 05 Dec, 2025 (0 Days Left)

Gem Bids For Outgoing Feeder With Acb 800amp, Acb Trolley For Acb, Bus Duct Including Supply, Vertical Panel For Acb 800amp, Supervision Charges

Ref. Document
View Tender
#TBR: 35803779 Closed

Power

  • Haryana
  • Due On: 04 Dec, 2025 (0 Days Left)

Spray Painting Of Isolated Phase Bus Duct Ipbd, Generator Pt Cubicle, Adaptor Box, Movdb Boiler, Oil Type Transformers, Dry Type Transformers, Rectiformers And Various Ratings Of Ht Motors During Forthcoming Overhauling Of Unit 2 Of 2X600 Mw, Rgtp Spray Painting Of Isolated ...

Ref. Document
View Tender
Download Document