Removal Of Wild Growth Bushes At Ifp
Repair Of Track Pads, Pins And Replacing With Serviceable Track Pads, Rebuilding Of Pivot Shaft By Material Deposition And Making Of 24 No Holes, Pivot Shaft Chassis Housing By Machining And Line Boring And Pressing Of 06no. Bushes, Etc Of D3 Dozer
Uprooting Of Grass Bushes And Cutting Of Branches Of Trees Along Trekking Route, Overhead Signal Cable Of Ews At Polok And Kanchanjunga Bridge Site Of Rangit Power Station
Supply Of Set Of Rubber Bushes, Set Consists Of 2 Set Of Rubber Bushes, Set Consists Of 2 Items As Given Below: 1 For A34 Bushing As Per Drg.no. Elw/bsl/wam4/4/113.024 -1 No/set 2 Oil Seal For Tfp Bushing A3.a4.a5.a6 As Per Drg. No. Elw/bsl/wam4/4/ F91.019 - 4 Nos/set..
Supply Of Nylon Bushes.
Supply Of Kit Of Brake Gear Nylon Bushes For Emu/memu Trailer Coaches As Per Rdsos Drg. No. Sketch- 90024 Alt. 4 Consisting Of 9 Items, I.e. Item Nos. J- 13 Nos., K-16 Nos., L-08 Nos, M-24 Nos, N-64 Nos, P-16 Nos, Q-32 Nos., R-08 Nos, S-32 Nos..
Supply Of Poh Kit For Emu Air Suspension Coach Bogie Brake Rigging Nylon Bushes As Per Icf Drg.no.emu-m-3-2-060 Alt. F/3.
Biennial Contract For Uprooting Of Bushes, Shrubs And Cutting Of Grasses Etc. Including Cleaning And Disposing Of Same At Designated Places, Bktpp.
Supply Of Main Pull Rod Assy. Long Without Bushes For Bcn Wagons.
Trimming Of Tree Branches, Cutting Of Bushes, Clearing Of Vegetation Etc. Around Lt/ht Power Line For Uninterrupted Power Supply And Shadow Free Lighting And Also Cradling Of O/h Of Damaged Cradle Guard Under Township Of Rajrappa Area For 120days