Maintenance And Repair Work Of Shiyal Distributary Of Rajpur Sub Branch Canal.repairs Canal Lining, Desilting Work, Earth Work Etc. For Reach 0.00 Km To 11.065 Km.
Providing Rcc Vertical Walls For Protection At Minor 19, Rcc Lining At Sub Minor-16 And Earth Work At Main Canal Of S.l.b.m.c. Sathara Section
Earth Work In Canal For Strengthening Of Weakened Bank And Daula With Correcting Of Internal Section In Main Canal Dah No.-02 Reach From 1.000 Km To 2.400 Km At Mahuwarikalan Pump Canal.
Construction Of Stone Lining And Earth Work In Main Canal Reach From 0.508 Km To 0.688 At Ramnagar Sikari Pump Canal.
Construction Of Stone Lining With 40 Percent New Stone Khanda And Earth Work In Main Canal From New Delivery Tank Reach 0.000 Km To 0.100 Km At Sakteshgarh Pump Canal.
Construction Of Stone Lining And Earth Work In Main Canal From Reach 0.550 Km To 0.790 Km At Jaugarh Pump Canal.
Link Canal From Munneru River To Srlip Palair Link Canal Earth Work Excavation, Formation Of Embankment Including Cm And Cd Structures Works On Link Canal From Munneru River To Srlip Palair Link Canal From Mulkanuru V Garla M Mahabubabad District To Srlip Palair Link Canal At Km 37.400 Near Buddaram V Garla M Mahabubabad District
Repair Of Earth Work Of Bund R.d. 0 t? 385 M., Construction Of Heads Sluice And Earth Work Of Main Canal, 1710 M & Canal, Lining Work Of Main Including Canal, Construction Of Aquaduct & Fixing Of 11 Nos. Outlets Of Bankheta Tank Scheme
Estimate Of Repairs Of Earth Work On Main Canal Of Rd 3730 M To 4055 M Of Zashinagar Lis.
Repair Work Of Embankment Earth Work For Right Bank Canal Of Semri Medium Project.