Lining And Earthwork For Canal Section Between Ch.0 To 36 M And 810 M To 2475 M. Of Lbmc Of Wankleshwar Bhey Irrigation Scheme.
Lining And Earthwork For Canal Section Bet. Ch.0 To 327 Mt. Of Rbmc And Minor 2rb And Minor Tail Of Lbmc Of Wankleshwar Bhey Irrigation Scheme.
Jungle Clearance, Desilting And Earthwork In Bhimdad Canal Network
Maintenance And Repairs To Goki Main Canal And Minors Including Resectioning Of Canal And Earthwork
Maintenance And Repairs To Waghadi Main Canal And Minors Including Resectioning Of Canal And Earthwork
The Provisions Included In The Estimate Are 1 C L E A R I N G G R A S S 2 C L E A R I N G J U N G L E 3 Earthwork Excavation For Desilting Canal Bed. General-Pvip - Kolenchery Branch Canal- Action Plan 2025-2026 Annual Maintenance Of Kolenchery Branch Canal Between Ch. 4.600 Km And Ch. 5.600 Km And Ch. 11.700 Km And Ch. 16.00
Construction Of D.H.P.C At Rd 370 M Of Mahammadpur Minor No. 1 Of Bembla Main Canal And Repairing Of Earthwork And Lining From R.D 320M To 420M And Repairing Of C.C Works To Tail Drain Of R.M-1 Offtaking At R.D 150 M Of Tamba Distributory Offtaking A
Constructing Remaining Canal Earthwork, Lining, Structures Etc Of Minors Offtaking From Ld-9 Distributary Of Botad Branch Canalpackagebbc/cad-4a-1
Earthwork Mr To Link Canal Rd 2160M To 2790M And Jeera Branch00m To 14050Mof Bipfor The Year 2025-26
Repair Of Earthwork And Lining Of Km 153 And 193 Of The New Mutha Right Bank Canal Construction Of Earthwork Lining Structure Repairs Head Regulators Outlets Repairs For Distributories No. 41 43 44 45 46 49 And 50 And Repair Works Of Head Regultors F