Restoration Of Road Surface From Ch. 7.10 Km. To Ch. 7.30 Km. Main Carriageway Of Kolkata Flank Of Kni Avenue Under Barasat Highway Division-i In The District Of North 24 Parganas. 2nd Call Of Enit-09 Of 2025-26, Sl-01 Wbpwrd/ee/bhd-i/enit12/25-26
Widening And Strengthening From Single Lane To Double Lane Carriageway Of Tatpally Linking Singitham To Kodur Road Km 0/0 To 9/4 To Makthakesaram Road Km 0/0 To 10/500
Emergent Repairing Of Damaged Bituminous Surface At Up Carriageway On Howrah Viaduct Hv-26- Hv-28 Of Vidyasagar Setu. Hrbc/jpmw/kr/7/25-26
Cleaning The Carriageways, Median Verges, Footpaths Of Howrah Viaduct Main Bridge To Toll Plaza Building Both Ways Of Vidyasagar Setu For The Year 2025-2026. 2nd Call Ref- Hrbc-pmw-kr-4-25-26 Hrbc/jpmw/kr/7/25-26
Restoration Of Carriageway And Hard Shoulder Damaged Due To Laying Of Pipelines By Phe Deptt. From 6.00 Kmp. To 6.50 Kmp. Along Dighirpar Muchisa Road Under Diamond Harbour Highway Division, P.w.r Dte.
Construction Of 24 And 45mboth Carriageway Wide Road For Approach Of Film City In Sector-21 Yeaincluding 5 Years Maintenance Wc-02
Providing And Laying Dbm And Bc Work Over 45mtr Wide Road Left And Right Side Carriageway Around Pocket -u In Sector -20 Yea. Wc-02
Resurfacing Work On 45mtr. Wide Road Both Side Carriageway Part -a In Sector -24, Yeida. Wc-04
Construction Of Main Carriageway Both Side Of 100mtr Wide Road Between Sec-21 And 34, 35 Yea Including 5 Year Maintenance Wc-02
Construction Of Balance 30 Mtr Wide Road Both Side Carriageway In Sector -17.yea Wc-04