Construction Of New Box Culvert On Existing Causeway At Che. 23/900 And Ch. 29/000 Km On Sugariya Modasar Zaru Lakhapara Tupperware Bhimasar Road Ch. 0/000 To 15/000 Km And 23/000 To 37/000 Km
Causeway To Bridge Construction Of Minor Bridge On Valandi Khadi On Ronvel Navera Road At Ch 4/4 To 4/5
Construction Of Stopdam Cum Causeway At Sakholi Gagar River
Permanent Repairs To Reconstruction Of Rf Canal Causeway Of Mi Tank Near Kantegaon V Boath M
Construction Of Causeway Across Local Vagu On R/f Pr Road To Shanigakunta Of Mangapet M
Construction Of Solid Causeway At Rd 0.804 To 0.828, 1.403 To 1.053, 1.109 To 1.115, 1.256 To 1.271, B.Wall At Rd 1.075 To 1.105 And P.L Cement Concrete Pavement In Various Slushy Reaches Construction Of Tapohal To Balhra Road Km. 0.00 To 1.315
Clearance Of Weeds And Strengthening Of Embankments From Regulator End To Kishangarh Causeway In Manimajra Beat, Nepli Range
Estimate For Crossing Rcc Pipes Over The Causeway At Rd 62130 Mtr For Village Kotla Gounspur Of Kandi Canal Stage 2
Interlocking Tile Work For Damge Causeway In Km 95 Nh 87
Preparation Of Detailed Project Report Dpr For Improvement Of 4nos Causeways To Rc Box Culvert In Between Km 595.00 To Km 597.00 Of Nh-31 New Nh 17 In The District Of Kalimpong Under Nh Division-ix, During The Year 2025-26.