Repair Of The Pre-fabricated Fall At Km 2.200 Of Sidhauli Rajwaha And Cc Lining Work Upstream And Downstream Of The Fall.
Repair Work Of C.c. Lining Of Km. 17 At Ch. 16/050 To 16/085 And Km. 16 At Ch. 15/995 To 16/030 Of Mohol Karamba Branch Canal Including Gate Repairs On Mohol Branch Canal
Repair Work Of C.c. Lining At Ch. 2/990 To 3/023 Km. 3 And Ch. 10/870 To 10/910 Km. 11 Of Mohol Karamba Branch Canal For The Year 2025-26.
Construction Of C.c. Lining Work At Rd 400m To 650m On Selected Patches On Sub-minor And Construction Of Inspection Path And Service Road Of Of Bhagimahari M.i. Project. Construction Of C.c. Lining Work Of Main Canal At Rd 1290 M To 1540 M Of Selected Patches Repairing And Construction Of Fall And Construction Of Outlet At Rd 300m Construction Of C.c. Lining Work Of Sub-minor On Selected Patches And Construction
Repair Work Of C.c. Lining At Ch. 2/990 To 3/023 Km. 3 And Ch. 10/870 To 10/910 Km. 11 Of Mohol Karamba Branch Canal For The Year 2025-26.
Head Protection 4 Nos Of Canals And Cc Lining And Floor Protection Work On Various Pucca Structures 12 Nos Between Km 22.000 To Km 36.400 Of Mahuli Dy
Cc Lining Work Near Internal Sections And Pucca Structures 16 Nos Of Sugia, Bargadwa, Karmahiya, Mugraha Minors Originating In Between Km 9.000 To 18.000 Of Khalilabad Branch.
Cc Lining Work From Km 0.000 To Km 1.100 Of Mighauli Rajwaha And From Km 11.900 To Km 12.800 Of Mighauli Rajwaha Extension Under Talgram Project.
Construction Of Balance C.c. Lining Work / R.c.c Trough For Main Canal In R.d. 0 To 6000 M And R.d. 20000 To 33300 M For Kar River Project .
Providing C.c. Lining Work And Canal Resectioning On Right Bank Canal In Required Section Between Km 7 000 To 9 000 Of Surya Major Project.