Maintenance Of 3-phase, 415 Volts Ac Ventilation Fans At Chemical House At Turamdih Mill
Comprehensive Operation & Maintenance Of Civil & Electromechanical Assets Such As Elevated Service Reservoirs E.s.r, Hglr, Sump, Chemical House, Staff Quarters, Pump House, All Bulk Transmission And Distribution Pipelines, Valves, Pumping Machinery & Electrical Equipment Etc. For Waghai Rwss, Including All The 30villages For 6 Months Period. Taluka: Waghai
Development Of The 40mgd Wtp And Chemical House Surrounding Areas At Igwtp. Kmc/igwtp/095/25-26, Dt-04/09/2025
Maintenance Of 3-phase, 415 Volts Ac Ventilation Fans At Chemical House At Turamdih Mill
Comprehensive Operation & Maintenance Of Civil & Electromechanical Assets Such As Intake Wells/structures Or Offtake Structures, Elevated Service Reservoirs E.s.r, Sump, Water Treatment Plant, Chemical House, Staff Quarters, Pump House, All Bulk Transmission And Distribution Pipelines, Valves, Pumping Machinery & Electrical Equipment Etc For The Kurgam-tumbi Water Supply Scheme/s, Including Supply Of 1.43 Mld Potable Water To All The Habitations 06 Villages For 24 Months Period. Taluka: Dharampur District:valsad Based On Well. 2 Nos.
Gem Bids For Customized Amc/cmc For Pre-owned Products - Revampingof Chemical House Roof Structure And Replacement Ofasbestos Sheet At Jaduguda Mill; Civil; Comprehensivemaintenance Contract Cmc; Not Applicable; Yes
Rejuvenation Work For Inlet Chamber, Chemical House, Raw Water Channels, Parshall...........house Of Existing 30 Mgd Water Treatment Plant At Kalyani Under Amrut 2.0 Phase-ii. Sefaws/w And S/kmda/t-02 Of 2025-26
Construction Of M.s. Stair At 4 Nos. Clariflocculator Tank, 2 Nos. Inlet Channel, 5 Nos. Discharge Hole And Chemical House Roof Along With Renovation Of 1st Floor Connecting Way Between Chemical House And Filter Bed Under Howrah Water Works Padmapuku Hmc/hww/05/2025-26/07
Upkeeping And Preventive Electrical Maintenance Works Related To Lt Switchgear, Dry Type Transformers 2.5mva, And Nspbds, Lt Motorsmax 110kw And Lt Boards Max 4000a Like Mldb, Wrdb In The Bop/ytps 5x800 Mwarea Such As A Raw Water Pump House, Clarifier, Dm Plant, Cpu, Foph, Rail Unloadingfoph, Pt Plant, Fire Water Pump House, Dm Transfer Pump House, Foam Pump House, Chemical Labs And Raw Water Chlorination Plant Etc From The Date Of Commencement Of Work To A Period Of Three Months For The Fy 2025-26.
Repairing, Painting And Roof Treatment Of Damaged Corridor Connecting Filter House And Chemical House With Allied Works Under Wtp-ii, Grww. Ws/grww/wtp-ii/14/2025-26/16