The Work Of Breakdown, Periodical, Preventive And Shut Down Maintenance Of All 6.6 Kv Ht Switchgear Of Main Plant Unit 3, 4Stage-Ii, Unit5, 6 Stage-Iii, Ash Handling Plant-Stage-Iii, Coal Handling Plant Including 6.6 Kv Ht 663 /P-2/Emp-W- 13108 Dtd 12.09.25
Work Of Reclamation Of 1600mt Spilled Coal/biomass And Desilting Of Drains As Per Scope Of Work In Coal Handling Plant Of Ggsstp, Roopnagar
Supply Of Carbon Brushes For Locomotives For Coal Handling Plant, Etps, Htps
Supply Of Spare Of Rail Track For Coal Handling Division, Ctps, Htps, Kasimpur And Supply Of Luv Joy And Geared Coupling For Chd-ii, Etps, Htps
Supply Of Machine Crushed Stone Ballast For Rail Track Of 1x110 Mw And 2x250mw For Coal Handling Division Ctps Htps Kasimpur And 1x660 Mw For Chd-i Etps Htps
Procurement Of Spares/consumables For Rail Track Maintenance Of 1x660 Mw For Coal Handling Division-i
Supply Of Elecon Make / Equivalent Make Roller Screen Sparescs Roll Body For Coal Handling Plant Sdstps
Ktps-vii Stage - Civil - O And M-i - Sd-ii - Providing Of Toilets To The Office Building And Material Store Room Beside Dozer Shed In Coal Handling Plant Chp Area 1x800mw Ktps-vii Stage, Paloncha, Bhadradri
Operation And Maintainance Of Bolier Setion At Varvand Unit Including Manpower For Handling Coal And Ash Operation And Maintainance Of Boiler Section Varvand Unit
Echp-I Cleaning Of Ht 6.6Kv And Lt 3 Phase 415V Horizontal And Vertical Bus Bars And Tightness Checking In Coal Handling Control Room Ss-Iii Switch Gear 3A 3B Bus In Echp-I Division