Transportation Of Mill Reject Coal From Reject Hopper Of Stage-ii To Stock Yard Of Mill Rejects And Clearing Of CoalPowder Collected Between The Mills And Other Mill Areas In Boiler Maintenance Division1*600mw For A Period From 01.04.2025 Or Actual Date Of Utilization To Till Date Of Completion.
Lifting And Transportation Of Accumulated Coal/coalPowder/dust At Surrounding Area Of Fans, Feeder Floor And Mills Surroundings In Boiler Maintenance Sub Division-iv As And When Required From The Date Of Actual Utilization To 31.03.2026 Or Till The Completion Of Quantity During The Fy 25-26.
Lifting Of CoalPowder, Ash And The Other Reject Material Collected From The Mill Reject System Of Unit 1 & 2 Sdstps And Disposing The Same At Suitable Place As And When Required During The Year 2025-26 Sdstps
-transportation Of Mill Reject Ground Coal From Mill Pits, Mill Trenches, Sumps And Mill Around Area To Reject Coal Stockyards For Mills A To H Of Mill Reject System And Clearing Of Spill Over Coal And CoalPowder Surrounding Of Millsa To H In Boiler Maintenance Division1*600mw For Fy 2025-26 From Actual Date Of Utilization To Till The Completion Of Quantity.
Upkeepment Of Conveyors By Cleaning The Coal, CoalPowder And Foreign Materials Etc., On Walk Ways, Return Belt, Deck Sheets, Head End Floor And Tail End Areas Of Conveyor68 And Cleaning, Checking And Round The Clock