Gem bids for Spares, Shaft Sleeve With O Ring, Rear End Bearing, Front Endbearing, Worm Planetary Gear Box, U-Seal, Shaft Seal, Control Drain O Ring, Screen Basket Assembly, Basketbearing, Shaft, Drive Shaft O-Ring, Turn Buckle Assemblyfor Outlet Pipe, Extraction Arm, Spool Piece, Control Drainpipeline, Spool Piece Connected Between Gear Sealingassembly, Debris Outlet Support Tee Plate, Frm Motormounting Frame With Scs Body, Elbow Connected With Tierods, Gear Sealing Support Tee Plate, Seal Kit, Softplastic, Dowel Pin For Sleeve-Pin 12 X 40 Lg, Dowel Pin Forsleeve-Pin 10 X 40 Lg, Screen Basket Bearing Screw, Sleeve With Drum Head Bolt, Intermediate Flange Stud, Elbow To Ddmv Flange Stud, Front Bearing Screw, Collection Arm With Spool Pipe Bolt, Outlet Disc To Spoolpiece Screw, Debris Discharge Bearing Nut, Debrisdischarge Bearing Stud, M12 Nut Part No-21850, Gearsealing Dummy Bolt, Rear Bearing Screw, Sleeve Centerbolt, M12 Nut Part No-21329, M10 Nut Part No-21342, Drive Shaft Flange Nut, Drive Shaft Flange Stud, Collectionarm With Spool Piece Nut, Worm Gear Box To Intermediateflange Bolt, Front Bearing Bolt, Outlet Disc Mounting Screw, Control Drain Flange Bolt, Nut M20, Gear Sealing Drummounting Stud, Gear Sealing Drum Mounting Nut, Bolt-M8x 15, Hex. Socket Grub Screw, Hex. Socket Cs Screw, Turnbuckle Upper And Lower Nut, Bolt-M16 X 40, Nut-M16, Hex. Soc. Head Cap Screw- M6, Bolt-M20 X 45Lg, Turnbuckle Upper And Lower Stud
Supply of Control Arm Bush.
Supply Of Set Of Control Arm Assembly Left Consisting Of Two Items..
Gem Bids For Lamp , P Assy , Harness , Pipe , S Valve , Control V , W Arm , F Pipe , Gasket , Terminal
Supply Of Template To Check Control Arm Silent Block Seat Of Fiat Bogielhb; Ref: Drg No.j&t/judw/16-621.material Cold Work Tool Steel To Is:3748/90, Hardness 50/55 Hrc. Note : Supply With Calibration Certificate Issued From Nabl/govt. Approved Lab..
Supply Of Manufacturing And Supply Of Fixture For Control Arm Assembly Of Lhb Bogie.
Supply Of Control Arm With Bottom Cover For Train- Control Arm With Bottom Cover For Train-18 Coaches As Per Drg. Nos. I Aaa02105, Alt A - Qty. 1 Nos. And Ii Aaa02106, Alt A - Qty. 1 Nos., Above Items To Be Manufactured And Supplied As Set..
Dismantling, Rep, Backfitment Of Tie Rod Assy, Control Valve, Steering Arm Assy, Wheel Hub Assy, Radiator, Flange Split, Yoke Assy, Head Light Guard, Battery Box, Fire Extinguisher Stand, Propeller Shaft Drive Of Ws28 Water Tanker Wt11 At Ashok Ocp
Supply Of Control Arm Assembly Right Consisting Of 02 Items For Lhb Coaches, As Per Attached Annexure. Warranty Period: 30 Months After The Date Of Delivery.
Supply of Parallelism Checking Tool No. 12.841.050 Parallelism Checking Tool No. 12.841.0502 For Control Arm Of Lhb Coaches As Per Attached Drawing. Firm Should Submit The Tc & Gc Along With Material. The Item To Be Supplied With Calibration Certificate From Nabl Approved Lab..