Ohe Modification Work In Connection With "(a) Yard Remodeling Of Barharwa Station Along With Extension Line No.1 & 2 In Malda Division Of Eastern Railway, (b) Extension Of Stabling Line At Bgp End Of Shivnarayanpur Station To 750 Mts. Along With Connection To Main Line And Signalling Facility Of Malda Division Of Eastern Railway, (c) Provision Of Brake Van Siding & Engine Escape Line At Sakrigali Station, (d) Extension Of Jamalpur Dock Line To Accomodate 12 (twelve) Coach Memu Rake Of Malda Division Of Eastern Railway & (e) Conversion Of Line No. 4 Of Abhaipur Station Into Common Loop Of Malda Division".
Conversion Of Oh Line To Ug Cable At Dappar Under Age I Dappar
Special Repair For Conversion Of Lt Oh Line To Ug Cable And Allied Works At Jutogh Mil Stn Under Ge I Jutogh
Special Repair To Conversion Of Lt Oh Line To Ug Cable And Allied Works Of Armd Regt And Stn Hq Area At Sri Ganganagar Mil Stn
Provision Of Temporary Adequate Lighting Arrangement During Pre-ni/ni/crs Or Any Other Occasion In Construction Organization In Connection With The Doubling/third Line/gauge Conversion/yard Remodelling & Other Program Etc In Dycee/con/gkp Jurisdiction, Wherever Is Required (for A Period Of 2 Years).
Augmentation For Conversion Of Lt Oh Line To Underground Cable And Connected Items At Fd Hosp Under Ge East Ferozepur Cantt
Spl Repair To Bldg No Sp 1 And T 2 And Spl Repair To Replacement Of Rusted Ci Gi Pipe With Di Ppr Pipe And Allied Works At Certain Location And Spl Repair To Conversion Of Ht Line With Ht Ug Cable At Bengdubi Mil Stn Under Ge Bengdubi
Annual Rate Contract For Work Of Conversion Of Overhead Ht Line To Mvcc Conductor Including Supply Of Mvcc Accessories Under Chhani, Koyali, Nandesari & Manjusar Sdn Of Barodao & M Division.
Annual Rate Contract For Work Of Conversion Of Overhead Ht Line To Mvcc Conductor Including Supply Of Mvcc Accessories Under Savli, Desar & Waghodia Sdn Of Barodao & M Division.
Electrical Work In C/w Provision Of New Hot Standby Ei Architecture At 09 Stations Of Sog-hmh-sgnr Section, Construction Of Ofc Room With Toilet Facility At Tibi & Jaitsar Station, Provision Of Ro Plant With 225 Kl Rcc Oh Tank & 40kl Cap Ug Tank At Sgnr And Replacement Of Old Corroded Pipe Line For Drinking Water Supply At Khinania & Nohar Railway Colony And Conversion Of Non-running Line No. 4 Into Running Line At Mandi Dabwali, Provision Of New Booking Office, Waiting Hall, Waiting Room, Circulating Area With Separate Gate And Extn Of Pf Shelter By 6 Bays At Pilibanga And Allied Infrastructure Development For The Cnc Tandem Under Floor Wheel Lathe Provision At Sgnr Depot Over Bikaner Division.