Supply of High Tensile Steel Screw Coupling For 22.5 T Draw Bar Pull For Wagon To Irs Drg. No. Wa/Bd-125, Alt.3 & Other Technical Requirements Conforming To Irs Specn. R-9- 66, Read With All Corrigendum Slip, Last Corr Igendum Slip 3 Of Dec. 1988 Warranty Period: 30 Months After The Date Of Delivery Quantity Tolerance +/-: 5 %Age, Item Category : Normal, Total Po Value Variation Permitted: Max 8 Lacs
Supply of High Tensile Steel Screw Coupling For 22.5 T Draw Bar.. High Tensile Steel Screw Coupling For 22.5 T Draw Bar Pull To Irs Drg.No. Wa/Bd-125, Alt.3, For Vvn & Other Technical Requirements Conforming To Irs Specn. R-9-66, Read With All Corrigendum Slip, Latest Corrigendum Slip No.3 Of Dec. 1988. Warranty Period: 30 Months After The Date Of Delivery
Supply of High Tensile Steel Screw Coupling For 22.5 T Draw Bar Pull To Irs Drg.No. Wa/Bd-125, Alt.3, For Vvn & Other Technical Requirements Conforming To Irs Specn. R-9-66, Read With All Corrigendum Slip, Latest Corrigendum Slip No.3 Of Dec. 1988. Warranty Period: 30 Months After The Date Of Delivery
Supply of Set Of Four Gauges Made For Inspection Of Screw Coupling, Draw Bar Section. Each Gauge Is Made Of Hardened Alloy Steel 5Mm/6Mm Thick And Permanently Etched Markings.Set To Be Supplied In Padded Carrying Case. Gauges Included In The Set Are:1. Gauge For Draft Yoke Hole.2. Gauge For Draft Yoke Bush Hole3. Gauge For Draft Yoke Pin4. Gauge For Draw Hoke Beam Wear Plate Rough Sketch Is Attached In Annexure-I For Dimensional Reference. Make : Prasad Or Similar. Warranty Period: 30 Months After The Date Of Delivery
Work Of Stripping & Fitment Of Foot Step Of Lhb Coaches, Cbc & Draft Gear Of Lhb Coaches, Stripping And Fitment Of Foot Step, Stop Screw, Screw Coupling, Draw Hook And Draw Bar With Pads, Draft Key Plate, Draw Hook Support Beam, Suspension Hook, Nylon Bushes Of Brake Gear Components Of Icf Coaches, Stripping, Overhauling & Fitment Of Isolating Cocks & Check Valves Of Icf Coaches And Fitment With Proper Alignment Of Bogie Mounted Brake Cylinder Of Icf Coaches At Jagadhri Workshop Northern Railway For 24 Months
Supply of Intermediate Tube / Draw Bar For Schaku Coupling, Make: Wsf/Escort/Sanok, For 3 Phase Memu, Qty. 06 Nos. As Per The Drawing Attached Warranty Period: 30 Months After The Date Of Delivery
Supply of Draw Bar Components For Ng Coaching Consisting Of Following Items In One Set I Coupling Link For Draw Bar Qty- 1 No Ii Draw Bar Long For Link End Only Qty-1 No Iii Draw Bar Short Complete Qty- 2 Nos Iv Draw Bar Long For Pin End Only Qty- 1 No Warranty Period: 30 Months After The Date Of Delivery
Supply of Intermediate Tube / Draw Bar For Schaku Coupling, Make: Wsf/Escort/Sanok, For 3 Phase Memu, Qty. 06 Nos. As Per The Drawing Attached Warranty Period: 30 Months After The Date Of Delivery
Supply of Draw Bar Components For Ng Coaching Consisting Of Following Items In One Set I Coupling Link For Draw Bar Qty- 1 No Ii Draw Bar Long For Link End Only Qty-1 No Iii Draw Bar Short Complete Qty- 2 Nos Iv Draw Bar Long For Pin End Only Qty- 1 No Warranty Period: 30 Months After The Date Of Delivery
Supply of Set Of Four Gauges Made For Inspection Of Screw Coupling, Draw Bar Section. Each Gauge Is Made Of Hardened Alloy Steel 5Mm/6Mm Thick And Permanently Etched Markings.Set To Be Supplied In Padded Carrying Case. Gauges Included In The Set Are: 1. Gauge For Draft Yoke Hole. 2. Gauge For Draft Yoke Bush Hole 3. Gauge For Draft Yoke Pin 4. Gauge For Draw Hoke Beam Wear Plate Rough Sketch Is Attached For Dimensional Reference. Warranty Period: 30 Months After The Date Of Delivery