Filling Of Gravel And Crusher Dust At Dumping Yard
Removal Of Spilled Over Coal And Fine Dust At Crusher House Floors By Head Loads On To Running Conveyor Required In Mm/chp/btps From 01.08.2025 Or Actual Date Of Commencement Of Work To 30.11.2025
Providing Crusher Stone Dust At Temples On The Occasion Of Bonal Festival At Various Places Of Ward No.135 For The Year 2025 In Alwal Circle, Ghmcreserved For St Item No.03
Providing Crusher Stone Dust At Temples On The Occasion Of Bonal Festival At Various Places Of Ward No.133 For The Year 2025 In Alwal Circle, Ghmc Reserved For Sc Item No.01
Providing Crusher Stone Dust At Temples On The Occasion Of Bonal Festival At Various Places Of Ward No.134 For The Year 2025 In Alwal Circle, Ghmc Item No.02
Providing Gravel And Crusher Stone Dust For Bonalu Festival In Ward No. 128 Gajularamaram And Ward No. 129 In Gajularamaram Circle For The Year 2025, Gajularamaram Circle-26, Ghmc Item No.02 Completion Period:01 Month
Addition/Altration, Repair And Construction Of Parking Stand For Vehicles, Teen Shade, Paver Block In Floor With Crusher Dust, Painting On Steel Pipe Etc
Providing Gravel And Crusher Stone Dust For Bonalu Festival In Ward No. 125 Gajularamaram And Ward No. 126 In Gajularamaram Circle For The Year 2025, Gajularamaram Circle-26, Ghmc Item No.01 Completion Period:01 Month
Providing Gravel And Crusher Stone Dust For Bonalu Festival In Ward No. 128 Gajularamaram And Ward No. 129 In Gajularamaram Circle For The Year 2025, Gajularamaram Circle-26, Ghmc Item No.02 Completion Period:01 Month
A Repair Of Tin Shed Roof Flooring Side Wall Sheet Tin Shed Camps 1. Chikhaldag Nanakbaydi 2. Kadmal 3. Nisarpur B Crusher Stone Dust Work On Passages Of Tin Sheds And Other Incidental Works As Required