Periodical Repair Of Road From Nh 208 To Juricherra Panchayat L 0 80 Km During The Year 2025 26 Under The Jurisdiction Of Ganganagar Pwd R And B Sub Division Sh Stripping Pucca Drain Pot Hole Repair Wbm Prime Coat Tack Coat Carpeting And Se
Periodical Repair Of Road From Nh 208 To Juricherra Panchayat L 0 80 Km During The Year 2025 26 Under The Jurisdiction Of Ganganagar Pwd R And B Sub Division Sh Stripping Pucca Drain Pot Hole Repair Wbm Prime Coat Tack Coat Carpeting And Se
Periodical Repair Of Road From Nh 208 To Juricherra Panchayat L 0 80 Km During The Year 2025 26 Under The Jurisdiction Of Ganganagar Pwd R And B Sub Division Sh Stripping Pucca Drain Pot Hole Repair Wbm Prime Coat Tack Coat Carpeting And Se
Improvement And Metalling Of Shamaghat Ghat To Jagjitnagar Road In Km. 7/00 To 14/00.Sh C/O Pcc R/Wall, B/Wall At Various Rds, C/O U And V Shape Drain And Repair To Pot Holes By Providing 30Mm Thick Bc Between Km. 7/00 To 14/00 Improvement And Metalling Of Shamaghat Ghat To Jagjitnagar Road In Km. 7/00 To 14/00
Mtc. Of Road From Jamaraipara Panchayet Office To Sukramani Para Para Ch- 0.00 Km To Ch-1.21 Km, Under Jampui Hill Sub-Division, Pwdrnb During The Year 2024-2025 Sh-Pot Holes Repair, Surface Drain, Wbm-3, Tack Coat, Carpeting, Seal Coat Etc.
Mtc. Of Kanchanpur Hospital Quarter And Sdm Quarter Road Length 0.840 Km Under Jampui Hill Sub Division, Pwdrnb During The Year 2024-2025 Sh-Pot Holes Repair, Surface Drain, Wbm-3, Tack Coat, Carpeting, Seal Coat Etc.
Mtc. Of Laljuri To Sadaiham Para Ch-0.00 Km To Ch-3.30 Km, Under Jampui Hill Sub-Division, Pwdrnb During The Year 2024-2025 Sh-Pot Holes Repair, Surface Drain, Wbm-3, Tack Coat, Carpeting, Seal Coat Etc.
Maintenance Of Kanchanpur-Jalabassa Road To Sdaiham Para Ch 0.00 Km To Ch 3.30 Km, Under Jampui Hill Sub-Division, Pwdrnb During The Year 2024-2025 Sh -Pot Holes Repair, Surface Drain, Wbm-3, Tack Coat, Carpeting, Seal Coat Etc.
Maintenance Of Kanchanpur-Jalabassa Road To Sdaiham Para Ch 0.00 Km To Ch 3.30 Km, Under Jampui Hill Sub-Division, Pwdrnb During The Year 2024-2025 Sh -Pot Holes Repair, Surface Drain, Wbm-3, Tack Coat, Carpeting, Seal Coat Etc.
Periodical Repair Of Road From Solonala To Bagaicherra Panchayet Office Road From Ch Point 1 Point 350 To Ch 2 Point 850 Km During The Year 2024 25 Sh Surface Drain Pot Holes Repair Re Carpeting Seal Coat Protection Works Etc