Improvement And Strengthening Of Cement Concrete Lining Of Main Ravi Canal From Rd 32400-32750M And 36800M-37400M Including Repair And Strengthening Of Aqueduct At Rd 32583M And Cross Drainage Syphon At Rd 37270M
Improvement And Strengthening Of Drainage Syphon At Rd 8450M, 8872M, 9096M, 9510M, 10200M, 11912M, 12003M, 13275M, 13655M, 13770M, 13933 M, 14038 M Of Main Ravi Canal At Places. Improvement And Strengthening Of Drainage Syphon At Rd 8450M, 8872M, 9096M, 9510M, 10200M, 11912M, 12003M, 13275M, 13655M, 13770M, 13933 M And 14038 M Of Main Ravi Canal At Places.
Road Work Improvement To Right Bank Of Kbc From Rd 43.20 Km. To 45.00 Km. Along With Renovation Of Drainage Syphon At Rd 43.80 Km. Near Village Kanpur
Strengthening Of Drainage Syphon Bet.ch.28000 M To 43000 M Of Ukai Left Bank Branch Canal.
Construction And Diversion Of Nallah / Deep Drain Into Ranbir Canal Near Shiv Mandir To Drainage Syphon At Muthi Jammu. Contract No Sdj/W/38/ 2025-26
Construction And Diversion Of Nallah / Deep Drain To Prevent Its Direct Outfall And Its Upto Patoli Drainage Syphon On Rd 18000 To Rd 16300M Of Mrc In Reserve Direction. Contract No Sdj/W/37/ 2025-26
Slip Clearance Mulba Of Patta Nallah, Cross Drainage Syphon At Rd 250m And Crossdrainage Syphon At Rd 975m And Mulba Slip Clearance From Water Conductor From Rd 0 M To 375m, Rd 1835m To Rd 1860m, Rd 2570m To 2600m And Rd 2680 To 2710m Of Swea Iii Hep
Clearing The Silt Deposited In Approach Channel, Tail Channel And Barrel Of Drainage Syphon At Ch. 82.344 Km (medi Kotar) And Ch. 98.178 Km (kakaria Kotar).
Reconstructing Of Drainage Syphon Structure At Ch.79.15 Rd On Krbmc.
Enquiry For Cleaning Of Slit/slush Debris From 8 Nos Drainage Syphon Constructed In Between Km 25.60 To Km 36.57 Of Cwc And Nallah Training At D/s Of 3 Nos Syphon At Silpara