Dredging Work Along 7.00 Km Downstream Stretch Of The Kolong River From Jakhalabandha Stadium Through Manual Cleaning, Cutter Suction Dredger And Chain-Mounted Excavators For The Year 2025 26 Phase-I
Cleaning And Dredging Of Drain From Sib Gate To Jnrum Drain, Near Ladies Security Barrack To Dc Culver, Drain Behind Psychiatry Ward, Rims, Imphal
Geo Technical Investigation Including Soil Testing In Connection With Dredging Desilting Removal Of River Bed Materials From New Cossye Rive For Length Of 15 Km Bhosra Khal For Length Of 14 Km Dholser Khal For A Length Of 4.5km In Block Debra Paschim
Dredging Of Daya River From Rd 18615m Botalama To 4080m Tirimal Bridge Under Doab-vii In Kanas Block Of Satyabadi Constituency
Cleaning And Dredging Of Drain From Sib Gate To Jnrum Drain, Near Ladies Security Barrack To Dc Culver, Drain Behind Psychiatry Ward, Rims, Imphal
Dredging And Cleaning Of Bell Mouths With Bar Screens At Raw Water Intake Jetties Ph-I, Ii And Iii Of Grww Using Competent Divers, Compressor Machines And Diesel Pumps For A Period Of 6 Months. Kmc/Ws/Grww/T-13/2025-26
Shifting Of Grab Dredger And Steel Pontoon From Dal Lake- Dockyard Complex Nishat To Brarinambal For Dredging Of Brarinambal Lagoon
Dredging Of Sedimentation Basin Of Ash Dyke Nkstpp
Annual Maintenance Dredging Of Thengapattanam Fishing Harbour In Kanniyakumari District.
Removal Of Silt Accumulated In The Storage Reservoir Of Svp Bhaba 120 Mw Through Online Dredging System Under Civil Maintenance Division, Hpsebl, Bhabanagar, Distt Kinnaur, H.P.