Gem bids for Supply, Installation And Commissioning Of Cyclone Dustcollector With Fan Assembly And Ms Ducting L
Supply Of Ducting Assembly For Wag-9 Loco For One Item Plenum Assembly As Per Drg. No. 1209.11.139.020 Per Loco Set- 02 Nos..
Supply of Hardware Kit For Ducting Assembly.
Supply of Hardware Kit For Ducting Assembly. For Wap-7 And Wag9-Hc Electric Locos. As Per Drg.No. 2921 0033 Alt. A Warranty Period: 30 Months After The Date Of Delivery
Supply of Kit For Gasket For Ducting Assembly For Wap-7 And Wag9-Hc Electric Locos. As Per Drg.No. 2925 0845 Alt A Warranty Period: 30 Months After The Date Of Delivery
Supply of Gasket Kit For Ducting Assembly For Wap-7 And Wag9-Hc Electric Locos. As Per Drg.No. 29250845 Alt. A Warranty Period: 30 Months After The Date Of Delivery
Modification In Wap-7 Locomotives For Fitment Of Hotel Load Converter, Transformer, Ducting Assembly And Associated Machine Room Modification.
Modification In Wap-7 Locomotives For Fitment Of Hotel Load Converter, Transformer, Ducting Assembly And Associated Machine Room Modification
Modification In Wap-7 Locomotives For Fitment Of Hotel Load Converter, Transformer, Ducting Assembly And Associated Machine Room Modification
Modification In Wap7 Locomotives For Fitment Of Hotel Load Converter, Transformer, Ducting Assembly And Associated Machine Room Modification At Els/Vskp