Excavation/ Earthwork For Development Of Wetland In Tabiji Talab
Repairing Work Of Damaged Protection Walls Due To Falling Of Boulders And Murrum From Nearby Hill And Repairing Of Washing Out Pitching And Earthwork Near D/s Of Westewier Due To High Flood At Kabutari Reservoir
Construction Of Cement Concrete Road With Bullah Pilling Earthwork And Brick Soling From Amirul Sardar House To Ismile Shekh House Mouza Barunhat Jl No 66 Sansad Xiv 14. Aap-25-26.fund-15th Fcun-tied.activity Code-110968243
Construction Of Cement Concrete Road With Bullah Pilling And Earthwork From Usman Sardar House To Kinu Gazi House Mouza Katakhali Jl 081 Sansad Xix 22. Aap-25-26.fund-15th Fcun-tied.activity Code-111007134
Earthwork In Filling With Good Earth In Low Land Near Boundary Wall Within The Campus Of Vivekananda Yuba Bharati Krirangan Salt Lake During The Year 2025 26
Patch Doubling Of Track Between Shoranur-vallathol Nagar Stations - Proposed Construction And Extension Of Platforms, Earthwork In Forming Bank, Blanketing Of Formation, Proposed Extension/construction Of Minor Bridges & Protective Works At Shoranur Yard Srr Km:0/0, Top Point: Km:-2/002 Ers, Km:-2/657pgt, Km:0/586 Nil, Km:0/741maq Include Pgt-ers Bypass Line, P-way Works In Srr Yard, Towards Pgt Side And Upto Lc No.1 In Vtk Side.
Strengthening Of Substructure And Replacement Of Existing Steel Girders Of 12.2m Span Of Major/important Bridges Of Br.no.284x12.2m In Bti-sog Section, Br.no.688x12.2m In Bti-sog Section, 724x12.2m In Sog-lgh Section, 028x12.2m In Sog-srpr, 725x12.2m In Sog-aph Section, 175 4x12.2m In Bti-hsr Section Of Bkn Division And Br No.35a5x12.2min Smr-bldi Section Of Ju Division Bridges By Post Tension Psc Slabs, Lifting /linking Of Track, Supply Of Ballast, Earthwork, Blanketing Work And Other Ancillary Work As Per 25t Loading Standard In The Jurisdiction Of Dy Ce/bridge Line/jp.
Jagadalpur - Kirandul Doubling Project - Construction Of New Route - 5 Including Earthwork In Formation, Extension Of Minor Bridges And Other Allied Works & Renovation Of Passenger Platform Pf -1 To High Level Platform At Bacheli Yard On Kk Line Of Wat Division Of East Coast Railway.
Earthwork Excavation, Providing Lime Concrete, Construction Of Masonry Wall, Reconstruction Of Base Stone Members, Stone Pillars, Roof Slabs, Water Tightening, Stone Flooring Etc., Transplantation Of Sri Chennakesava Swamy Temple, Vellaturu Ii Under Pulichintala Project, Suryapeta Dist., Execution Of Work
Construction Of Precast Compound Wall, Area-grading Earthwork And Misc. Civil Works At Additional Land For Two-side Expansion At 220kv Hgis Sub-station, Sartanpar