Construction Of Arch At Municipal Office Entrance At Pedda Vanthena In Vuyyuru Nagar Panchayat
New Railway Hospital At Perambur - Proposed Facade, Provision Of False Ceiling In Corridors, Entrance Arch, Parking Area And Other Allied Works Inside Newly Constructed New Railway Hospital Complex.
New Construction Entrance Arch In Corporation Middle School Of Masakalipalayam At Ward No 53 East Zone.
Consultancy Work For Preparation Of Dpr For Additional Works Barbed Lounge Gallery With Tensile Roof And Toilets Entrance Arch Wayilp Flooring, Additional High Mast Light Building Elevation Greenary Video Wall Equipment For Gym And All Other
Gem Bids For Doctors Table With In-Out Tray Size 4 X 2.5, Patient Couch, Three Seater Chairs Ss With Cushion, Frp Structure Mural Ofshri Dhanvantri Ji With Steel Letters 18Ft X 13 5Ft, Flutedpanel Work Beneath The Roof Main Outer Area 40X30-200Sqft, Fire Extinguisher Small, Mist Fan Heavy Duty, Windowblinds Zebra Type, Flower Pots Small With Steel Planter Andplant, Entrance Gate Arch Board Acrylic Letter Fixed Overacp Sheet Both Side Of The Gate, Frosting Work The Door Size10x12x10x12 10X12 With Customized Design Laser Cut-Out, Main Board At The Front Facade Of The Building Acrylic Letterswith 3D Cut-Out Boundary Fixed With Blackened Iron Frameechs Pole Clinic Jammu With Logo Both The Sides
Guntakal Division-Sri Kalahasti: Proposed Upgradation Of Station Under Abs Phase- Ii.1 Prov Of Entrance Arch, 2 Prov Of Stn Bldg Facade & Portico, 3Construction Of 1St Floor Of Station Building, 4 Prov Of New S&T Building, Etc.5Elec-M Works, 6 Digital Display Boards, S&T Works, 7Elec-Trd Works8full Length Cop, 9Second Entry/Exit Opp. To New Bldg, 10 Divyang Toilets, 11Boundary Wall On Pf No.2 & 3 - Electrical Arrangements.
Construction Of Arch At Municipal Office Entrance At Pedda Vanthena
Construction Of Entrance Arch At Melpoovanikuppam Periyar Ninaiuv Samathuvapuram In Poovanikuppam Panchayat
Guntakal Division:Pakala: Proposed Upgradation Of Station Under Abs Phase-Ii. 1 Station Building Balance Works 2 Improvements To Circulating Area, 3 Provision Of Entrance Arch, 4 Isolated Cop5divyang Toilets Etc Two Packet
Guntakal Division :Swi-Piler - Proposed Upgradation Of Station Under Abs Phase- Ii1 Facade Improvements 2 Impr To Concourse3 Provision Of Parking For 2&4 Wheelers4 Provision Of Footpaths In Approach Roads5 Balance Drainage Arrangements Swii-Kadiri: Proposed Upgradation Of Station With 1Provision Of Entrance Arch, 2Improvements To Circulating Area And 3Provision Of Toilets On Platform Etc.