Complete Repairing And Overhauling Alongwith Enamel And Epoxy Painting Of Kirloskar Make 40 Hp Drainage Pump No 01 And 02 Of Khara Power House Complete In All Respect 2 Rewinding And Varnishing Of Crompton Greave Make 40 Hp Of Spare Drainage Pum
Strengthening Of Pipe Support. Struc. Of 1600Mm Dia And Others F W Transm. Pipeline By Ms Struct. Works, Epoxy Painting And Other Ancillary Works For Impro. Of Struc. Health On Khal Portion In Between M. Gangully St. And Galif St Valve Stn. Kmc/Ws-Central/47/2025-2026
1 Concrete Chipping. 2 Microconcreting. 3 Chemical Plastering. 4 Thixotropic Plastering. 5 Cement Grouting. 6 Chemical Anchoring. 7 Epoxy Painting 8 Bonding Agent Application 9 Screed Concreting Water Treatment Plant Civil Repair Works
City Water Supply Scheme - City Water Supply Scheme - Concrete And Epoxy Painting Of 1219 Mm Dai Ms Pipline At Chitegaon Oppositte Zilla Parishad.
Epoxy Painting For 5 Nos Of Unitary Air Washer Units 1 No Blower In Masonry Air Washer Unit And 3 Nos Of Cooling Towers Of Chiller Unit During Aoh Coh 2025 Ot 202 Epoxy
Carrying Out Of Epoxy Screed Lining And Painting For Various Civil Structure At Etp Stp Rwtp In Connection With Crude Oil Import Terminal Project For Nrl At Paradip Bandr/Coit/40089/Epoxy Screed Lining Paint
Epoxy Based Painting And Repairs Of Psc Bridges, Br. No. 42/1 Up &dn On Mnkd- Pnvl And Raoli Junction Flyover (bridge No 10/2) In Vdlr-mm Chord Section Of Mumbai Division.
1 Concrete Chipping. 2 Microconcreting. 3 Chemical Plastering. 4 Thixotropic Plastering. 5 Cement Grouting. 6 Chemical Anchoring. 7 Epoxy Painting Water Treatment Plant Civil Repair Works
Gem Bids For Supply Of Gaskets, O Ring, Teflon, Washer, Bushing Seal, Teflon Tape, Flex-kwik, Devgun Putty, Supply Of Materials Asper Is Standard For Complete Epoxy Painting Single Coatprimer Double Coat Paint Of Each Transformer, Bucholzrelay, Mog, Breather With Silica Gel, Oil Temperatureindicator, Winding Temperature Indicator, Pressure Reliefvalve, Ht Bushing, Lt Bushing, Neutral Bushing, Octc, Prismatic Gauge, Wti Ct, Aircell, Complete Marshallingbox With All New Parts, Radiator Valves, Hv Turret Ct, Lvturret Base Plate, Support Insulator, Radiator, Hardware, Site Overhauling Charges For 12.5mva Transformer, Oiltesting From Nabl Approved Lab
Overhauling Including Repairing Fabrication Epoxy Painting Then Replacement Of Screen Gate Of Suction Pits Of Cw Pumps And Providing Services Of Diving Team To Work Inside Water At Cw Pump House Of 2x500 Mw Btps Anpara