"provision Of Iot Devices/intelligent Field Devices (ifds) For Monitoring & Control (indian Railways Native Iot Based Yield Analysis Telemetry, Recording And Control -ir-niyantrac) Of Electrical General Assets Like Pump, Platform (30/70%) Lighting, Street Lighting, Lifts, Escalators, Substation Etc. For 07 Numbers (belpahar, Champa, Raigarh, Baradwar, Naila, Akaltara, Korba Or Any Other) Of Amrit Bharat Stations In Bilaspur Division Of Sec Railway, Bilaspur (chhattisgarh)".
Hyb Division: Provision Of Web Based Monitoring (iot) And Controls Of Pumps Including Automation Of Pumps, 30%-70% Lighting On Platforms, Street Lighting Circuits, Lifts And Escalators, Dg Sets, Substations Integrate With Ir-niyantrac Portal.
Replacement Of Escalators Installed At Anand Vihar Fob Under Pwd Sub Division-3/m-2533, Shahdara
Design, Supply, Installation, Testing And Commissioning Of 4Nos. Outdoor Type Passenger Escalators With Black Synthetic Rubber Handrail, Stainless Steel Hairline Balustrade, Comb Plate With 5 Years Of Amc At Matabari 4Nos Passenger Escalators
And Routine Maintenance And Operation Of Electrical Sub-station, D.g. Sets, Fire Alarm System, Wet Riser And Sprinkler System, Drinking Water Supply Pump Set, Passenger Lift And Escalators Installed At Extension Block Tis Hazari Court. Repair Maintenance Operation Specialized Electrical And Mechanical Services Of Tis Hazari Court Complex, Delhi Sh Routine Maintenance Of Ei And Fans And Compound Light
Annual Repair And Maintenance Of Of Lifts And Escalators At Thyagraj Sports Complex, New Delhi Dg. 2024-25. - Providing And Fixing Of Handrail Of Otis Make Escalator.
Jp Div. - Electrical Work In C/w Provision Of 03 Escalators (up & Down) On Each Platform Of Phulera Station
Fabrication Of Canopy Over Escalators Of Foot Over Bridge Near Gurudwara Dukh Niwaran Sahib Patiala Under Head 5054 Rb 10
Construction Of Shopping Complex At Guruvayur Under Guruvayur Devaswom-Escalators
Annual Rate Contract For Repairing Works Of Schindler Make Escalators Installed At Different Metro Stations Of Line-01, 03 And Ael For A Period Of 3 Years.