Work Of Replacement Of Non-Functional Esp Hopper Heaters At Unit 3, Kltps
Gem Bids For Repair, Maintenance, And Installation Of Plant/Systems/Equipments Version 2 - Industry Unit; Servicecontract For Supply And Installation Of Insulation Andcladding Sheet In Esp Hopper, Ash Handling Plant, Unit 3 &4; As Mentioned In Scope /
Evacuation Of Ash From The Boiler, Esp, Bottom Ash Hopper, I.d Fan Area, Related To Overhauling Of Unit # 06 At Ktps
Supply Of Esp Hopper Bottom Assembly With Heating Chamber For Ab Path Of Unit Iv Esp
Supply Of Esp Hopper Bottom Assembly With Heating Clamber For Ab Path Of Unit V Esp
Procurement Of Thermopads Makes Hopper Heaters For Esp Of Unit 3 And 4, 2x660 Mw Sstpp, Mppgcl, Dongalia.
Nctps I Se Mi Circle Aoh 25 26 Bm Dn Unit Iii Esp Bottom Hopper Reconditioning Of Damaged Eroded Portion Of Esp Bottom Hopper Patch Up And Strengthening Works During Annual Overhaul For The Year 2025 26 Nctps I Se Mi Circle Boiler Maintenance Division Annual Overhaul Work For The Year 25 26 Specification No 232 25 26
Rotation And Replacement Of 200nb And 300 Nb Ci And Ms Pipe Line Of Esp Hopper And Bottom Discharge Line, Vacuum Line, Ash Slurry Disposal Line During Overhauling Of Unit 3, 2 And 210 Mw, Btps
Esp Hopper Complete Assembly
Evacuation Of Ash From The Boiler, Esp, Bottom Ash Hopper, I.d Fan Area, Related To Overhauling Of Unit # 03 At Ktps