Hiring Of Mining Machinery For Excavation Of 36 Lt Of Waste For A Period Of Two Years I E At 18 Lt Per Annum At Deposit 14 Of Biom Kirandul Complex Hmm For Waste In Dep 14 Kdl
amtc of EPHS in sector 5 UE Karnal Repair of water supply leakages including all type of tools fuel excavation machinery complete in all respect and all other works
Amtc of EPHS in sector 4 UE Karnal Repair of water supply leakages including all type of tools fuel excavation machinery complete in all respect and all other works
Hiring Of Mining Machinery For Excavation Work Up To 45.00 Lt, Waste 25.00 Lt Of Bvj +/-20% And 20.00 Lt Of Shale +/-20% And 15:00 Lt Of Ore +/-20% In Two Years At The Rate Of 20% And For One More Year On The Basis Of Rental Items And Conditions