Sh Preparation Of Project Report For Aa Es Working Estimate Including Field Survey, Related Study, Estimation Including Topographical Survey Site Plan, L-section, Etc. By Outsourcing Including Drawing Of All Civil Structures And Hydraulic Desi Consultancy Service For Preparation Of Estimate For Construction Of Office Residential Building Of Assistant Engineer At Jsv Sub-division Chandi In Tehsil Kasauli
Sh Preparation Of Project Report For A/a E/s, Including Field Survey Related Study, Estimation Including Topographical Survey Site Plan, L-section, Etc By Outsourcing Including Drawing Of All Civil Structure And Hydraulic Design. Consultancy Service For Augmentation Of Lwss Baddi Town In Tehsil Baddi Distt. Solan Hp
Hubballi Division: Carrying Out Of Field Survey, Preparation Of Conceptual Plan & Gad For Elimination Of Lc Gates By Rob/rub In Ubl Division.(62 Nos).
Verification, Alteration, Modification As Per Field Survey And Providing Assistance For Finalization Of Award Of Submitted Land Acquisition Proposal For Private Land/government Land, Preparation Of Plan For Forest Diversion Proposal As Per Forest Conservation Act-1980, Demolition Of Structures, Obtaining Permission For Cutting Of Trees In Existing Railway Land, Felling Of Trees, Providing Land Boundary Posts With Unserviceable Sleepers & Other Allied Works In Connection With Construction Of 3rd Line Between Kur-ipm Section & Station Premises And Construction Of Flyover At Khurda Road Of East Coast Railway.
Construction Of Part-I Work Of Sonegaon Minor And Ghoghra Minor With Survey Of Field Channel On Loharisawanga Distributory Of Kar River Project
Preparation Of Detailed Project Report With All Necessary Survey, Field Works, Traffic Census, Soil Investigation, Pavement Design And With Necessary Estimate For Upcoming Project Work Of Kakina Road, From 0.00 Km To 8.75 Km, W/S Niq2/2025-26/Ae/Chsdii/Sl01
Consultancy Service To Examine Techno-Economical Feasibility And Carry Out Detailed Field, Geological, Command Area Survey Along With Preparing Detailed Estimate, Dtp For Providing Irrigation Facility To The Non-Irrigated Area Of Nizar Taluka By Lifting From Tapi River Near Hathoda Bridge Villge Hathoda Ta. Nizar, Tapi District
Field Survey Work In Connection With Dredging/ Desiting/ Removal Of River Bed Materials From Shilabati River From Ramdebpur To Simana For A Length Of 14.100 Km In Block Daspur-I Ps - Daspur And Dist- Paschim Medinipur Under No Cost To State Wbiw/Ee/Kcdiv/Enit-013E/25-26 Sl No-01
Field Survey Work In Connection With Dredging Desilting Removal Of River Bed Materials From Katan Khal From Hijli To Panna For A Length Of 16.2 Km In Block Ps Ghatal And Dist Paschim Medinipur Under No Cost To State Exchequer Basis. Wbiw/Ee/Kcdiv/Enit-013E/25-26 Sl No-02
Digitization, Geotagging And Contour Plan, Demarcation Of Government Senior Secondary School Bara, Government Senior Secondary School Basaral, Galore Mav School, Kangoo Day Boarding School Using Drone Uav/ Total Station Etc. Involving Field Survey Construction Of Various Schools