Design, Construction, Supply, Testing And Commissioning Of Piped Water Supply Schemes For Habitations Left Out Under ?Har Ghar Nal Ka Jal? Nischay Yojna In Areas Having Ground Water Quality Issues; With Electric Driven Pumps And FluorideRemoval Treatment Plant Having Technology Adsorption/ Ion Exchange/ Membrane/ Nano Technology/ Etc. Certified By Csir Or Any Other Institute Of National Repute. In The District Of Jamui, Bihar On Turn-Key Basis With 6 Months Trial Run Period And Comprehensive Operation And Maintenance Of 60 Months Under Mukhyamantri Grameen Peyjal Nishchay Yojna Quality Affected. Under P.H.Division
Design, Construction, Supply, Testing And Commissioning Of Piped Water Supply Schemes For Habitation Left Out Under Har Ghar Nal Ka Jal Nischay Yojna In Area Having Ground Water Quality Issues With Electric Driven Pump And FluorideRemoval Treatment Plant Having Technology Certified By Csir Or Any Other Institute Of National Repute In The District Of Jamui On Turn Key Basis With 6 Months Trial Run Period And Comprehensive Operation And Maintenance Of 60 Months Under Mukhyamantri Grameen Peyjan Nishchay Yojna
Design, Construction, Supply, Testing And Commissioning Of Piped Water Supply Schemes For Habitations Left Out Under Har Ghar Nal Ka Jal Nischay Yojna In Areas Having Ground Water Quality Issues; With Electric Driven Pumps And FluorideRemoval Treatment Plant Having Technology Adsorption/ Ion Exchange/ Membrane/ Nano Technology/ Etc. Certified By Csir Or Any Other Institute Of National Repute., On Turn-Key Basis With 6 Months Trial Run Period And Comprehensive Operation And Maintenance Of 60 Months Under Mukhyamantri Grameen Peyjal Nishchay Yojna Quality Affected
Work Of Annual Operation Maintenance Of 1 Year As Per The Prescribed Schedule Of Electrolytic FluorideRemovalPlant Edf Capacity 1000 Liters Per Hour Installed In The Following Villages/Habitations
Design, Construction, Supply, Testing And Commissioning Of Piped Water Supply Schemes For Habitations Left Out Under Har Ghar Nal Ka Jal Nischay Yojna In Areas Having Ground Water Quality Issues With Electric Driven Pumps And FluorideRemoval Treatment Plant Having Technology Certified By Csir Or Any Other Institute Of National Repute In The District Of Jamui Bihar On Turn Key Basis With 6 Months Trial Run Period And Comprehensive Operation And Maintenance Of 60 Months Under Mukhyamantri Grameen Peyjal Nishchay Yojna
Design, Contruction, Supply, Testing And Commissioning Of Piped Water Supply Schemes For Habitatius Left Out Under Har Ghar Nal Ka Jal Nischay Yojna In Areas Having Ground Water Quaimy Sues Electric Driven Pumps And FluorideRemoval Treatment Plant Having Technology Adsorption Lon Exchange/ Lembrane Nano Lechnology Etc. Certified By Csir Or Any Other Institute Of National Reputa Diarict Of Banka, Bihar Tum-Wy Bash With 6 Months Tital Run Period And Compre Operation And Maintenance Of Months Under Mukhyamant Grameen Peyjal Nishchay Yojna
Design, Construction, Supply, Testing And Commissioning Of Piped Water Supply Scheme For Habitation Left Out Under Har Ghar Nal Ka Jal Nischay Yojna In Area Having Ground Water Quality Issues With Electric Driven Pumps And FluorideRemoval Treatment Plant Having Technology Certified By Csir Or Any Other Institute Of National Repute. In The District Of Banka, Bihar On Turn Key Basis With 6 Months Trial Run Period And Comprehensive Operation And Maintenance Of 60 Months Under Mukhyamantri Grameen Peyjal Nishchay Yojna
Design, Construction, Supply, Testing And Commissioning Of Piped Water Supply Scheme For Habitation Left Out Under Har Ghar Nal Ka Jal Nischay Yojna In Areas Having Ground Water Quality Issues With Electric Driven Pumps And FluorideRemoval Treatment Plant Having Technology Certified By Csir Of Any Other Institute Of National Reputed In The Banka Bihar On Turn Key Basis With 6 Months Trial Run Period And Comprehensive Operation And Maintenance Of 60 Months Under Mukhyamantri Grameen Peyjal Nishchay Yojna