Supply of Set Of Frp Roof Panels & Side Wall Panel For Lhb Slr Hog Coaches 31- Seater And Set Of Frp Middle Panels For Roof For Lwscz.
Supply And Installation Of Frp Side Wall Panel / End Wall Panel For Emu/3Ph Coaches To Drg. No.Emu/C/Hc Er-4-2-001, Col-I, Alt-Nil, Items - 1 To 5 & 11, Frp Partition Panel To Drg.No.Emu/C/Hc/Er-4-3-001, Col-I, Alt- Nil, Item-6, Frp Roof Panel To Drg.No.Emu/C/Hc/Er- 4-4-001, Col-I, Alt- E Except Item-1 And Specn. For Frp Panel Shall Be As Per Icf/Md/Spec - 1 67A, Issue Status, Rev-05 With Amd-01 To 04.Please Visit Icf Vendor Portal For Downloading Drawin G Https://Vp.Icf.Gov.In/Vendtendordetnew.Php Using Key: 072499Zxfjf2609. Warranty Period: 30 M Onths After The Date Of Delivery Quantity Tolerance +/-: 5 %Age, Item Category : Normal, Total Po Value Variation Permitted: Max 8 Lacs
Supply And Installation Of Frp Side Wall Panel/ End Wall Panel To Drg.No. Em U/D/Er/Bt776-4-2-001, Col-I, Alt-Nil, Items-1 To 8, Frp Partition Panel To Drg.No. Emu/D/Mmts- 4-3-001, Col-I, Alt-Nil, Item - 1, Frp Roof Panel To Drg.No. Emu/D/Mmts-4-4-001, Col-I, Alt - D.Sp Ecification For Frp Panel Shall Be As Per Icf/Md/Spec - 167A, Issue Status-01, Rev-05 With Am D-01 To 04.Please Visit Icf Vendor Portal For Downloading Drawing Https://Vp.Icf.Gov.In/Vendtendordet New.Php Using Key: 0724Tl09kyr2386 Warranty Period: 30 Months After The Date Of Delivery Quantity Tolerance +/-: 5 %Age, Item Category : Normal, Total Po Value Variation Permitted: Max 8 Lacs
Supply And Installation Of Frp Side Wall Panel End Wall Panel To Drg.No. E Mu D Er Bt776-4-2-001, Col-I, Alt-A, Items-1 To 8, Frp Partition Panel To Drg.No. Emu D Mmt S-4-3-001, Col-I, Alt-Nil, Item - 1, Frp Roof Panel To Drg.No. Emu D Mmts-4-4-001, Col-I, Alt - D . Specification For Frp Panel Shall Be As Per Icf Md Spec - 167A, Issue Status-01, Rev-05 With Amd-01 To 04.Please Visit Icf Vendor Portal For Downloading Drawing Https://Vp.Icf.Gov.In/Vendtendorde Tnew.Php Using Key: 0724Q66cqka1703. Warranty Period: 30 Months After The Date Of Delivery
Supply of Supply & Installation Of Frp Side Wall Panel / End Wall Panel For Emu/3Ph Coaches To Drg. No.Emu/C/Hc/Er-4-2-001, Col-I, Alt-Nil, Items - 1 To 5 & 11, Frp Partition Panel To Drg.No.Emu/C/Hc/Er-4-3-001, Col-I, Alt- Nil, Item-6, Frp Roof Panel To Drg.No.Emu/C/Hc/Er-4-4-001, Col-I, Alt- D Except Item-1 And Specn. For Frp Panel Shall Be As Per Icf/Md/Spec - 167A, Issue Status, Rev-05 With Amd-01 To 04.Please Visit Icf Vendor Portal For Downloading Drawing Https://Vp.Icf.Gov.In/Vendtendordetnew.Php Using Key 0723Bqfc6no1814 Warranty Period: 30 Months After The Date Of Delivery
Supply And Installation Of Frp Side Wall Panel/ End Wall Panel To Drg.No. Emu/D/Mmts-4-2-001, Col-I, Alt-A, Items-1 To 8, Frp Partition Panel To Drg.No. Emu/D/Mmts- 4-3-001, Col-I, Alt-Nil, Item - 1, Frp Roof Panel To Drg.No. Emu/D/Mmts-4-4-001, Col-I, Alt - C. Specification For Frp Panel Shall Be As Per Icf/Md/Spec - 167A, Issue Status-01, Rev-05 With Amd-01 To 04. Please Visit Icf Vendor Portal For Downloading Drawing Https://Vp.Icf.Gov.In/Vendtendordetnew.Php Using Key:07230Bjfjwh1843 Warranty Period: 30 Months After The Date Of Delivery
Supply And Installation Of Frp Interior Panelling Of Lslrd Coaches: 1.Frp Sidewall Panel Arrangement To Drg No. 741Lslrd4-2-004 Col-I, Alt-A-1 No Except Lavatory Inside, Endwall Ss Panel And Air Exhauster Arrgt. 2.Frp Partition Panel Arrangement To Drg No.741Lslrd 4-3- 002 Col-I, Alt-C-1 No Except Lavatory Inside Ss Panel And Door Way Partition Ss Panel.3.Frp Roof Panel Arrangement To Drg No.741 Lslrd 4-4 -002 Col-I Alt- Nil Except Item -1 -1 No. For Frp Panel Shall Be As Per Specification Mdts-133, Rev-05 Without Painting To Specification Mdts-118. Required Colour Shade To Be Achieved Through Gel Coat Compreg Packing, Aluminium Extrusions Required For Installation As Per Drawing Will Be Supplied Free By Icf.Please Visit Icf Vendor Portal For Downloading Drawing Https://Vp.Icf.Gov.In/Vendtendordetnew.Php Using Key 0723Ic7zr701808 Warranty Period: 30 Months After The Date Of Delivery
Supply of Set Of Frp Roof Panel For Lhb Ac Double Decker Coaches. Follow Colour Shade As Per Lno. Md22151 Dated 23.09.2022., As Per Drawing: Mplrplwczdac Version 4, Packing Instruction: Frp Ceiling Sheet/Side Wall Panels/Frp Component: Self Adhesive Biodegradable Plastic Lamination Sheet To Be Provided On Each Component. Projected Metallic Parts To Be Protected With Plastic/Nylon/Frp Caps/Proper Wrapping Of Biodegradable Bubble Sheet From All The Sides. Each Component To Be Packed In Biodegradable Bubble Sheet All Around With Proper Tapping & Then To Be Placed In Cardboard Box Followed By 3 Nylon Strips Tightened From Both Sides. Then Collective Packs Of Components To Be Packed In Wooden Cage Made From Wooden Strips Of Size 100X20mm & Gap Between Each Strip Should Not Be More Than 100Mm.On The Wooden Crate Base 3 Wooden Pegs Of Size100x100mmalong The Length To Be Provided For Ease In Handling With Fork Lifter. Roof Ceiling Having Curved Surfaces In Addition To Above Packing Should Be Stacked On A Metallic Frames Before Packing In The Wooden Boxes. One Package Should Not Contain Material Belonging To More Than One Coach Set & Grouping Should Be Preferably Of Similar Sizes. Also Packing Should Have Indication Like 1/4, 2/4 Etc. E.G. Four Packings Will Make One Coach Set So That One Complete Coach Set Can Be Easly Identified. The Maximum Weight Of The Wooden Crate Should Not Be More Than 200 Kgs. A List Should Be Pasted On Each Wooden Crate Showing Order No, Plno, Description Of Item, Drg No/Spec No/Set List No. With Version, Qty, Firms Name & Address, Date Of Despatch Etc. Warranty Period: 30 Months After The Date Of Delivery
Supply of Set Of Frp Roof Panel For Lhb Ac Double Decker Coaches. Follow Colour Shade As Per Lno. Md22151 Dated 23.09.2022., As Per Drawing: Mplrplwczdac Version 4, Packing Instruction: Frp Ceiling Sheet/Side Wall Panels/Frp Component: Self Adhesive Biodegradable Plastic Lamination Sheet To Be Provided On Each Component. Projected Metallic Parts To Be Protected With Plastic/Nylon/Frp Caps/Proper Wrapping Of Biodegradable Bubble Sheet From All The Sides. Each Component To Be Packed In Biodegradable Bubble Sheet All Around With Proper Tapping & Then To Be Placed In Cardboard Box Followed By 3 Nylon Strips Tightened From Both Sides. Then Collective Packs Of Components To Be Packed In Wooden Cage Made From Wooden Strips Of Size 100X20mm & Gap Between Each Strip Should Not Be More Than 100Mm.On The Wooden Crate Base 3 Wooden Pegs Of Size100x100mmalong The Length To Be Provided For Ease In Handling With Fork Lifter. Roof Ceiling Having Curved Surfaces In Addition To Above Packing Should Be Stacked On A Metallic Frames Before Packing In The Wooden Boxes. One Package Should Not Contain Material Belonging To More Than One Coach Set & Grouping Should Be Preferably Of Similar Sizes. Also Packing Should Have Indication Like 1/4, 2/4 Etc. E.G. Four Packings Will Make One Coach Set So That One Complete Coach Set Can Be Easly Identified. The Maximum Weight Of The Wooden Crate Should Not Be More Than 200 Kgs. A List Should Be Pasted On Each Wooden Crate Showing Order No, Plno, Description Of Item, Drg No/Spec No/Set List No. With Version, Qty, Firms Name & Address, Date Of Despatch Etc. Warranty Period: 30 Months After The Date Of Delivery
Supply of Set Of Frp Roof Panel For Lhb Ac Double Decker Coaches. Follow Colour Shade As Per Lno. Md22151 Dated 23.09.2022., As Per Drawing: Mplrplwczdac Version 4, Packing Instruction: Frp Ceiling Sheet/Side Wall Panels/Frp Component: Self Adhesive Biodegradable Plastic Lamination Sheet To Be Provided On Each Component. Projected Metallic Parts To Be Protected With Plastic/Nylon/Frp Caps/Proper Wrapping Of Biodegradable Bubble Sheet From All The Sides. Each Component To Be Packed In Biodegradable Bubble Sheet All Around With Proper Tapping & Then To Be Placed In Cardboard Box Followed By 3 Nylon Strips Tightened From Both Sides. Then Collective Packs Of Components To Be Packed In Wooden Cage Made From Wooden Strips Of Size 100X20mm & Gap Between Each Strip Should Not Be More Than 100Mm.On The Wooden Crate Base 3 Wooden Pegs Of Size100x100mmalong The Length To Be Provided For Ease In Handling With Fork Lifter. Roof Ceiling Having Curved Surfaces In Addition To Above Packing Should Be Stacked On A Metallic Frames Before Packing In The Wooden Boxes. One Package Should Not Contain Material Belonging To More Than One Coach Set & Grouping Should Be Preferably Of Similar Sizes. Also Packing Should Have Indication Like 1/4, 2/4 Etc. E.G. Four Packings Will Make One Coach Set So That One Complete Coach Set Can Be Easly Identified. The Maximum Weight Of The Wooden Crate Should Not Be More Than 200 Kgs. A List Should Be Pasted On Each Wooden Crate Showing Order No, Plno, Description Of Item, Drg No/Spec No/Set List No. With Version, Qty, Firms Name & Address, Date Of Despatch Etc. Warranty Period: 30 Months After The Date Of Delivery