Gem Bids For Custom Bid For Services - Rewinding And Reconditioning Of 4 Nos Furnace Transformer (45kva 90kva 50 Kva & 160kva) And 1 No Power Distribution Transformer(500 Kva) Of Engine Division Koraput
Overhauling Of 33kv Oltc Of 6mva Furnace Transformer Of Ferro Manganese Plant
Gem Bids For 3 1075 Kva 111.05kv Furnace Transformer 11kv0.433kv 1600kva Transformer 2500kva 11kv0.433kv Dyn11 Transformer
Supply of 2 725 Kva Ss-18 Furnace Transformer
Supply Of Shaft, Dwn:Pd/R-375159, F/Dc-3 F1 Pump - Centrifugal Column Bottom Pump Dcu Iocl, Dc Spv Deep Well Submersible Pumping Systems, Flexible Shaft Grinder, Dc Charging Station, Portable Voice Recorder, Dc Anvil Ofb, Dc Electronic Load, Tractors V1, Dc Current Transducer, Dc Solar Wire, Worm Gear, F/Thickner-3, Pd/R- 375244, Pn:02 - Worm Gear Box, Polycarbonate Lathi Mha, Wheel Worm, Gear Shaper, Shaping Machine As Per Is 10949, Gear Couplings, Gear Puller, Forged Or Rolled Alloy And Stainless Steel Pipe Fitting, Hydraulic Gear Pump, Cotton Bandage Cloth V2, Sleeve F/Cold Well Pump, Ph-26 - Sleeves For Dvt Pump, Submersible Sewerage Pump, Ac Spv Deep Well Submersible Pumping Systems, Cold Forged Steel Rivets For Cold Closing-Is:2998, Dc Spv Deep Well Submersible Pumping Systems, Forged Or Rolled Alloy And Stainless Steel Pipe Fitting, Ac Spv Deep Well Submersible Pumping Systems V2, Seamless, Welded And Heavy Cold Worked Austenitic Stainless Steel Pipes, High Pressure Washer, Portable Pump Set For Fire Fighting As Per Is 942, Spider Assly, F/Cw F-1 Pump, Pd/R:278812 - Deltamethrin F As Per Is 14411, Marine Fuels Class F Conforming To Is 16731, Pedestal Safety Lock, Txn Fluid T- 20- Defence, Carton Box To Drg No P-144F In Finished Condition, Anesthesia Breathing Circuit - Mapleson F Infant T Piece Breathing Circuit V2, Control Transformer, Jacket Combat, Muffle Furnace, Tlc Plate, Silica Gel 60, Spider, F/Cold Well Pmp, Pdr- 201540R3, Pn:1 - Deep Well Plates, High Pressure Washer, Led Well Glass Fixture, Forged Or Rolled Alloy And Stainless Steel Pipe Fitting, Medical Cold Storage Chilling Units - Cold Box, Polycarbonate Lathi Mha, Deltamethrin F As Per Is 14411, Laboratory Cold Room, Wrought Carbon Steel And Alloy Steel Pipe Fitting For Moderate And High Temperature Service, Modular Cold Rooms, Bush F/Cold Well Pmp, Pd/R- 201540R3, Pn:2 - Carbon Bush, Bush Bearing, Forged Or Rolled Alloy And Stainless Steel Pipe Fitting, Unplasticized Polyvinyl Chloride Pvc - U Screen And Casing Pipes For Bore / Tubewells V2 As Per Is 12818, Thermocouple Standards Platinum / Platinum Rhodium, Muffle Furnace, Deep Well Plates, Revolving Chair V4, Led Well Glass Fixture, Medical Cold Storage Chilling Units - Cold Box
Supply of 6 Ignition Transformer For Melting Furnace
Rewinding, Repair, Erection, Testing And Commissioning Of 24Mva, 33Kv, Ngef Make Furnace Transformer
Civil Work For Construction Of Furnace Foundation, Transformer Block And Platform For 30Ton Eaf In Sms, Cffp.
Supply of 2 Furnace Transformer. Rating 78 Kva. Details As Per Annexure Furnace Transformer. Rating 96 Kva. Details As Per Annexure
Supply, Installation, Commissioning And Testing Of Shell And Tube Type Heat Exchanger For 12.5M Va Areva Make Transformers Located At Electric Arc Furnace Eaf Transformer Room. Required Specification: Capacity - 250Kw, Type - Single Tube/Wall, Mounting - Horizontal, Tube Material - Cu Ni 90 10, Other Moc - Cs Of Is 2062, Design Pressure Kg/Cm2 Shell/Tube - 5/5, Test Pressure Kg/Cm2 Shell/Tube - 7.5/7.5, Design Te Mperature Degree Celsius Shell/Tube - 100/100, Oil Flow - 800 Lpm, Water Flow - 600 Lpm Of Thermo Engi Neers Private Limited Make Or Equivalent In All Respects. Note: - 1 Two Coat Epoxy Paint Will Be Applied On Outer Shell. 2 Supplied Heat-Exchanger Should Be 1:1 Replacement Of Existing Heat-Exchanger. So, No Modific Ation Should Be Required In The Existing System For The Installation Of The Supplied Heat-Exchanger. However, If Any Minor Changes Are Required In Existing Foundation And Flange Fitment During Installation It Will Be Under Firms Scop E. 3 The Drawing Attached Is For General Guidance Only. Manufacturer/Supplier Should Study The Site Con Ditions Before Supply For The Fitment And Efficient Working Of The Product. Rwp Approved Drawing Number Rwp/M Ms/Elec./01 Attached For Reference. 4 All Additional Parameters Which Are Not Mentioned In Description Or In Att Ached Drawing Should Be As Per Is 6088:1988 Standards Or Latest. No. Of Stage Inspection:1 Excluding Final Lot I Nspection. Description Of Stage-1 Inspection: As Per Approved Qap As 100% Of Po Qty. Warranty Period: 2 4 Months After The Date Of Delivery