Constructing Gabion protection wall at village lake (survey no.1185) near Mahakali Mata temple At village Rangpur Taa. Mansa Dist. Gandhinagar
54/2025-26 Construction Of Gabion, Cct, Dcct, Mpt, Pt, Pond Construction Of Gabion, Cct, Dcct, Mpt, Pt, Pond
C/O Gabion Crate Wire R/Wall At Rd. 11/760 To 11/785. Restoration Of Road Damages On Mandi Gagal Chailchowk Road Km 0/0 To 16/190
Contruction Of Gabion Wall For Rehabilitation Houses At Taliye, Tal.mahad, Dist.raiagd
Construction Of Toe Crate Wall And Gabion Pitching On Left Side Of River Jhelum At Malpora Tokina Rd 22400m
Construction Of Gabion Dam At Mouje Adhi Group No. 1 And Rough Stone Dam At Mouje Dogroli Group No. 2
Supplying And And Avenue Planting 500 Nos. Of Trees Along With Gabion Within Mine Premises Near Ocp Main Gate, Chrusher Point, Nearby Zero Point, Along Ob Dump, Nearby Mgr Line, With Maintenance Period Of 1 Year Under Rajmahal Area.
Design And Construction Of 03 Vup At Billowa Tiraha 1197.280 Kalyani Chauraha 1200.250 And Arru Tiraha 1216.000 For Permanent Rectification Of Morth Identified Blackspot Locations Along With Gabion Wall In Jaurashi Ghati 1192.000 To 1192.700 Lhs And
Construction Of Gabion Type Breast Wall At Different Locations Of Ranikor Moheshkhola Baghmara Road Sh-04 From Km 30.000 Nongjri To Km 129.385 Baghmara In The State Of Meghalaya In Fy 2025-26. Nhidcl / Ro-shg / Ranikor-maheshkhola - Baghmara /sh-4/2025/01/
Construction Of Pakka Check Dam And Gabion Structure At W.C. Parapeepli, Ranayra Under Pmksy-2.0 Wdc-3 P.S. Dag District Jhalawar