Estimate For Restoration And Protection Work Gabion Retaining Wall At Rd 1750 Of Power House Road Near Check Post 06.
Construction Of Toe Crate Wall And Gabion Pitching On Left Side Of River Jhelum At Larkipora Rd 26300m
Construction Of Toe Crate Wall And Gabion Pitching On Left Side Of River Jhelum At Malpora Tokina Rd 22400m
Construction Of Buttress Wall And Gabion Wall For The Protection Of 110Kv Substation Compound At Kodungallur
Pvip-Dam Safety-Protection Wall For Damaged Gabion Pvip-Dam Safety-Protection Wall For Damaged Gabion On The D/S Right Of Bhoothathankettu Barrage
R R Damage To Rcd Road Km 0 00 To 92 695 Sh C O Catch Pit Toe Wall In Pcc 1 3 6 And Gabion Check Wall At Catch Pit Inlet And Below D S Toe Wall In Various Rds Between 71 000 To 92 195
Estimate For Restoration And Protection Work Gabion Retaining Wall At Rd 575 Of Power House Road Near Check Post 10.
Construction Of Gabion Wall For Bank Protection At Village Bhimdad, Ta.- Gadhada
Constructing Of Gabion Protection Wall On S.r. Between Ch. 2138 To 2180 M Of Kosamba Branch
Flood Mitigation Work To The Eroded Portion By Using Construction Of Gabion Wall And Groynes In Left Bank Of Cauvery River In Melur Village And Right Bank Of Coleroon River In Vellithirumutham Village Of Srirangam Taluk In Trichy District.