Scr Construction Organisation: Nanded Division. Akola-khandwa Section-gauge Conversion Of Track From Mg To Bg Between Akola - Akot Stations- Execution Of Balance Works For "laying And Linking Of Bg Track, Leading Of P-way Materials, Ballast Leading And Dumping Etc., And Connected Works For Yard Remodelling At Akola Junction In Nanded Division Of South Central Railway.
Conducting Final Location Survey (fls) For (i) New Bg Railway Line Projects (appx. Length Equal To 900.00 Km), (ii) Gauge Conversion/doubling/ Third Line/ 3rd And 4th Line (appx. Length Equal To 600.00 Km.) Of Various Projects In India, Nepal And Bangladesh (iii) Preliminary Engineering Cum Traffic Survey From Gangtok To Nathula (appx. Length Equal To 240.00 Km) In The State Sikkim With Geo-technical Investigation. Preparing Firr/eirr, Epc Document And Submission Of Dpr Etc. As Per Railway Board's Latest Guide Lines Complete In All Respect
Design, Supply, Erection, Testing & Commissioning Of 25 Kv Ac Provision Of 3rd Feeder Bay In Connection With Amreli-khijadiya Gauge Conversion Work Of Bhavnagar Division Of Western Railway.
Provision Of Temporary Adequate Lighting Arrangement During Pre-ni/ni/crs Or Any Other Occasion In Construction Organization In Connection With The Doubling/third Line/gauge Conversion/yard Remodelling & Other Program Etc In Dycee/con/gkp Jurisdiction, Wherever Is Required (for A Period Of 2 Years).
Design, Supply, Erection, Testing And Commissioning Of Scada System In Ndt- Dohm Section Of Ajmer Division, Nwr In Connection With Gauge Conversion Work.
Construction Of Balance Civil Engineering Works Including Formation, Minor/major Bridges, Rubs/subways, Station Buildings, Staff Quarters, Platforms, Passenger Amenities, Supply & Spreading Ballast, Track Linking, P Way Works And Other Associated Works In Connection With Conversion Of Existing Narrow Gauge Track To Proposed Broad Gauge Track For 25 T Loading Standards Between Dabhoi (excluding) To Waghodiya (including) Railway Stations From Km 33.04 To Km 54.00 (20.96 Km) In Connection With Miyagam- Dabhoi- Samlaya Gc Project In Vadodara Division Of Western Railway.
Construction Of Balance Civil Engineering Works Including Formation, Minor/major Bridges, Rubs/subways, Station Buildings, Staff Quarters, Platforms, Passenger Amenities, Supply & Spreading Ballast, Track Linking, P Way Works And Other Associated Works In Connection With Conversion Of Existing Narrow Gauge Track To Proposed Broad Gauge Track For 25t Loading Standard Between Waghodiya (excluding) To Samlaya (including) Railway Stations From Km 54.00 To Km 78.60 (24.60 Km) Along With Lotna Ror (km 74 To 83.12 =9.12 Km) And Surface Connection At Lotna (km 74 To 81=7.0km) In Connection With Miyagam- Dabhoi- Samlaya Gc Project In Vadodara Division Of Western Railway.
Design, Supply, Erection, Testing And Commissioning Of Railway Electrification Work Of 1x25kv Psi System In Ndt-dohm Section Of Ajmer Division, Nwr In Connection With Gauge Conversion Work.
Doubling Of Track Between Tvc- Cape: Preparation And Submission-of Digitized Final Certified Land Plans Pertaining To Doubling Projects Between Kyj-mvlk, Mvlk-cngr, Cngr-cgv, Kyj-qln A Qln-tvc And Gauge Conversion Between Qln And Edn.
Construction Of Road Over Bridge And Road Under Bridge At Railway Level Crossing No. Ar-12 (nh-130c) Ch:15710 Navapara-rajim And Other Allied Miscellaneous Works In Connection With "gauge Conversion From Narrow Gauge To Broad Gauge Between Kendri-dhamtri And Abhanpur-rajim Branch Line (67.20 Kms)".