Interlocking Tiles Flooring Iin Generator And Boiler House
Repairs And Replacing Of Burner Block, Etc In Steam Boiler And Hot Water Generator Installed In Main Boiler House Of Skims For The Year 2025-26
Tnpgcl Mtps Ii 1X 600 Mw Es Circle Tgmca Division Capital Overhauling Of 1X600mw Turbine And Generator Drive Turbine Of Boiler Feed Pump B And Its Valves In Mettur Thermal Power Station Ii Ot 10/25-26
Sp.109 Nctps-Ii Es Circle Mrt Division Unit Ii Generator Turbine And Boiler Areas And Their Auxiliaries Time Bound Contract Works For The Routine Maintenance Of Mrt Equipment For A Period Of 360 Days Upto 31 03 2026 From The Date Of Taking Over
Sp.113 Nctps Ii Es Circle Mrt Division Unit I Generator Turbine And Boiler Areas And Their Auxiliaries Time Bound Contract Works For The Routine Maintenance Of Mrt Equipment For A Period Of 360 Days Upto 31 03 2026 From The Date Of Taking Over Th
Repairs And Replacing Of Burner Block, Various Items In Steam Boiler And Hot Water Generator Installed In Main Hospital At Skims Soura Srinagar
Supply Of 50 L Biofermenter, 5 L Seed Fermenter, Plc Based Centralized Control Panel, Ph Sensors, Software Supervisory Control And Data Acquisition System For Realtime Bioprocessing Control And Monitoring Of Both 5L And 50L Fermenters, Laptop For Scada Software, Steam Generator Electric Boiler 18 Kw, Air Compressor 10 Cfm 100 L Storage Tank, Chiller Circulator With Water Circulation Pump, Ribbon Mixer Blender Total Capacity 300 Kg, Steam Sterilizer Chamber Total Capacity 50 Kg, Ss Pipe Line And Fitting From Fermenter To Utilities, Ultra Pure Water Purification Unit, Do2 Sensors
Repairing Of Insulation Of Hot Water Generator, Steam Boiler And Heat Exchangers At The Ashok Hotel New Delhi.
Annual Onm Contract For Btg Boiler Turbine Generator And Off Site Round The Clock Field Operation And Maintenance At Ntpc Jhabua Power Ltd For 3 Years Contract With Possible 1 Year Extension
Custom Bid For Services - Biennial Contract For C And I Operation And Maintenance Of All Field Instrument And C And I Systems In Unit 1 Unit 2 Of Boiler Turbine Generator Bop And Instrumentation Lab Works At Ntpl