Laying Of Geotube 20 Mtr Length 2.0 Mtr Dia In 60 Mtr Length Arail Area In Prayagraj In Magh Mela 2025-26
Laying Of Geotube 20 Mtr Length 2.0 Mtr Dia In 60 Mtr Length R/b Of River Ganga E In Prayagraj In Magh Mela 2025-26
Laying Of Geotube 20 Mtr Length 2.0 Mtr Dia In 80 Mtr Length L/b Of River Ganga E In Prayagraj In Magh Mela 2025-26
Kiifb-Fsh001-01 Erosion Mitigation Measures Muthalapozhy Fishing Harbour - Shore Protection Work At Kadinamkulam Kayal In Thiruvananthapuram District Using Geotubes
Providing, Filling And Fixing Of Geotube Without Balli Piling Under Project Of Dredging Work To Protect Village Ithaua Purab, Other Villages And Alinagar-Ganeshpur Embankment Block-Barinbagh, Dist Situated At Right Bank Of River Saryu
Providing, Filling And Fixing Of Geotube Without Balli Piling For Protection Of Village Rahulnagar Ambey Chandiya Hazara, Block-Rampur Mathura, Distt. Situated At Right Bank Of River Sharda
Providing, Filling And Fixing Of Geotube Without Balli Piling Under Project Of Dredging Work To Protect Village Shankarpur Near Akhiri, Other Villages And Chalhari-Ganeshpur Embankment, Distt. situated At Right Bank Of River Ghaghara
Providing, Filling And Fixing Of Geotube Without Balli Piling Under Project Of Dredging Work To Protect Village Basantpur And Other Villages, Block-Puredalai, Dist, From Flood And Erosion Situated At Right Bank Of River Saryu
Installation/ Laying Of Geotube Under Project Of Dredging Work In Ghaghra River To Protect Belha Behrauli Embankment And Other Villages From Flood And Erosion In District
Providing, Filling And Fixing Of Geotube Size 2.29M X 20M Without Balli Piling As Per Bill Of Quantity For River Training Work At Village Madanpur Kevtaliya Dam