Supply Of Gi Earth Pipe 10 Feet Long 40 Mm Dia
Gem bids for Replacement, Inspection Testing Checking, Attending Break Down Faults, Repairing Of 11 Kv Goab, Replacement Faulty Transformer, Painting The Entire Transformer Body, Supply Aluminumarmoured Power Cable, Laying Of Xlpe Power Cable, Supplying And Making End Termination, Providing And Fixing6 Swg Dia Gi Wire, Earthing With Gi Earth Pipe, Providingand Laying Earth Connection
Gem Bids For Inspection Testing Checking , Attending Break Down Faults , Repairing Of 11 Kv Goab , Replacement Faulty Transformer , Painting The Entire Transformer Body , Supply Aluminum Armoured Power Cable , Laying Of Xlpe Power Cable , Supplying And Making End Termination , Providing And Fixing 6 Swg Dia Gi Wire , Earthing With Gi Earth Pipe , Providing And Laying Earth Connection
80Mm Diameter 3 Meter/10 Feet Length Gi Earth Pipe With Sealed Component Filling Including Soil Moisture Enhancer 50Kg Per Earth Pipe
Gem Bids For Supply, Installation, Testing, Commissioning , Sitc Of Dg Set Capable Of Delivering Minimum 1180 Bhp, Pitc Of Suitable Size Ms Pipe, Earthing With Gi Earth Plate, Providing And Fixing 25 Mm X 5 Mm Gi Strip In 40 Mm Dia Gipipe, Providing And Fixing 25 Mm X 5 Mm Gi Strip, Supplying And Fixing 50mm X 12 Mm Thick Gi Earth Strip, Dismantling Of Existing 1010 Kva Silent Dea Set, Supplyingand Making End Termination
Supply Of Gi Earth Pipe
Gem Bids For 10 Kva Ups Sitc At Hpcl Jatni Lpg Plant Minimum Average Annual Turnover Of The Years Of Past Experience Required For Mse Exemption For Years Of Experience And Startup Exemption For Years Of Experience Experience Criteria Past Performance Bidder Turnover Annual Turnover Additional Doc 1 Requested In Additional Doc 2 Requested In Atc *in Case Any Bidder Is Seeking Exemption From Experience / Turnover Criteria The Supporting Documents To Prove His Eligibility For Exemption Must Be Uploaded For Evaluation By The Buyer Do You Want To Show Documents Uploaded By Bidders To All Bidders Participated In Yes Bid/ Primary Product Category Supply Installation And Testing Of 10kva Ups With Batterybattery Rack And Interlink Time Allowed For Technical Clarifications Inspection Required By Empanelled Inspection Authority / Agencies Pre- No Registered With Gem Arbitration Clause No Mediation Clause No, 1045 Supply Installation And Testing Of 10kva Ups With Battery Battery Rack And Interlink Supply And Installation Earth Station With 80mm Gi Pipe Charcoal Salt Including Earth Chamber With Cover And Provide The Earth Test Report Supply And Laying Of 16 Sqmm Copper Wire From Earth Pit To Upd And Ups Db Supply And Fixing Of Ups Power Distribution Board 12 Way Supply Of 10 Amp Sp Mcb Supply And Fixing 32 Amp 30ma Elcb Supply 4 Pole 63 Amp Mccb With Enclosure For Incoming And Outgoing Supply And Laying Of 16 Sqmm And 3.5 Core Al Armoured Cable Supply And Making End Termination Of Power Cable With Proper Gland Anf Cable Lugs Supply And Fixing Of 2.5 Sqmm 2 Nos And 1 Sqmm 1 No Copper Wire With Pvc Pipe Supply And Laying 6 Sqmm 2nos. And 1sqmm 1 No. For Main Power With Pvc Or Cashing Caping
Gem bids for Sitc Of 1010Kva Dea Set At Te Bldg Mi Road Jaipur, 62 Sitc Of Dg Set Capable Of Delivering Minimum 1180 Bhp Pitc Of Suitable Size Ms Pipe Earthing With Gi Earth Plate Providing And Fixing 25 Mm X 5 Mm Gi Strip In 40 Mm Dia Gi Pipe Providing And Fixing 25 Mm X 5 Mm Gi Strip Supplying And Fixing 50Mm X 12 Mm Thick Gi Earth Strip Dismantling Of Existing 1010 Kva Silent Dea Set Supplying And Making End Termination
Procurement Of 1600 Nos.Of Gi Earth Pipe 40Mm Diameter 3M Length To Tirunelveli Region As Per Specification
Gem Bids For Supply Installation Testing Commisioning Of 1010kva Dea Set At Te Bldg Mi Road Jaipur, 62 Sitc Of Dg Set Capable Of Delivering Minimum 1180 Bhp Pitc Of Suitable Size Ms Pipe Earthing With Gi Earth Plate Providing And Fixing 25 Mm X 5 Mm Gi Strip In 40 Mm Dia Gi Pipe Providing And Fixing 25 Mm X 5 Mm Gi Strip Supplying And Fixing 50mm X 12 Mm Thick Gi Earth Strip Dismantling Of Existing 1010 Kva Silent Dea Set Supplying And Making End Termination